troiaii assortiti
This commit is contained in:
parent
f33d2d8a0a
commit
f9dca29cde
File diff suppressed because it is too large
Load Diff
|
|
@ -0,0 +1,651 @@
|
|||
|
||||
49 Activity short name
|
||||
1.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 1 Activity Duration 2
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Consiglio Nazionale delle
|
||||
OU short name 1 Participant
|
||||
Ricerche
|
||||
|
||||
52 Activity description
|
||||
During this activity, the Infrastructure Manager (IM) will lead the management of the following activities:
|
||||
●Organisation of the Kick-off event
|
||||
●Creation of the management plans necessary to govern the Research Infrastructure: DOP(See D1.1), QAP(See D1.2), CDP (See
|
||||
D1.3) and SMP(See D1.5)
|
||||
●Set-up of the entire management and governance structure of ITSERR and its implementation.
|
||||
●Organisation of WP Staff Trainings: Knowledge Transfer (ca. #10 trainings foreseen) from innovation and High-Tech market leaders
|
||||
achieved by providing training on various innovation related topics such as Design Thinking and Innovation Organisation Design for
|
||||
WP Leaders, Artificial Intelligence, etc.;
|
||||
●Synchronisation with RESILIENCE: the RESILIENCE CEO participates in the Board as the responsible person for full-
|
||||
synchronisation with the RI strengthened by ITSERR and its partners. Effectively, the timing of both projects allows a strategic
|
||||
allocation of resources and mutual benefit and this task is to always make sure that the added-value created by ITSERR converges in the
|
||||
RESILIENCE ecosystem;
|
||||
|
||||
|
||||
|
||||
439 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [1 - Project and Impact Management]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
RESILIENCE ecosystem;
|
||||
●Creation of a Welcome Pack for new joiners: each new ITSERR member will receive a series of inception training elements to accelerate
|
||||
their learning-curve, with a set of artefacts (such as documents, slide-decks, webinar, live Q/A sessions, forum with FAQ, etc.) based on
|
||||
controlled documentation.
|
||||
●Definition of the sustainability of the project beyond the 30 months of duration of the project;
|
||||
●Closure event: aside the event that will happen not later than 31/12/2025, the intention of ITSERR management is to :
|
||||
○Submit the Closure Report (D1.7) ensuring that all lessons learned are collected and shared globally within the ITSERR ecosystem;
|
||||
○Ensure that the artefacts of the project will be sustained and maintained during 10 years after the end of the project.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
6.776,64 €
|
||||
|
||||
Cost description: Infrastructure Manager
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
69.495,00 €
|
||||
|
||||
Cost description: Software development team leading, quality assurance manager, security officer
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
5.339,01 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Monitoring
|
||||
49 Activity short name
|
||||
|
||||
|
||||
|
||||
|
||||
440 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [1 - Project and Impact Management]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
1.2
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Consiglio Nazionale delle
|
||||
OU short name 1 Participant
|
||||
Ricerche
|
||||
|
||||
52 Activity description
|
||||
During this activity, all project and WP managers and leaders will perform the following management activities:
|
||||
●Daily stand-up: Each working day at 9AM,the WP leader organises with all the WP team a stand-up meeting of 15 to 30 minutes
|
||||
to review the backlog of tickets/work requests.
|
||||
|
||||
●Weekly monitoring: the Team Leaders, WP Leaders and Impact Officer participate in a weekly meeting to follow up on WP activities.
|
||||
For Incident Management, focus will be on avoiding new occurrences and handling critical incidents. They also ensure that the project
|
||||
Knowledge Management System is kept up-to-date.
|
||||
●Cross-project follow-up: The Infrastructure and team Leaders will ensure that cross-pollination does occur between the different teams,
|
||||
that synergies are favoured and avoidance of re-doing the same activity twices.
|
||||
●Monthly Steering Committee and Continuous Improvement Meeting: The Scientific Coordinator, The Infrastructure Manager, the
|
||||
Team Leaders, the WP Leaders, The Quality Manager and the Security Officer gather once per month to evaluate the progress of the
|
||||
contract towards the strategic objectives and take strategic decisions,
|
||||
●HR Monitoring reviews and realigns the needs of project resources
|
||||
●Impact Monitoring: impact is part of Project Management as it is intended to monitor and measure the performance of the project in the
|
||||
short term and the consequences its outcomes produce in the long term.
|
||||
●Scientific coordination: as an infrastructure mainly stemming from research issues coming from Religious Studies, ITSERR requires a
|
||||
strong and high-profile scientific coordination.
|
||||
●Quality Assurance activities performed by the Quality Assurance Manager who is accountable for the Quality Assurance of the project
|
||||
and respond to the Infrastructure Manager
|
||||
●Security Mgt/Monitoring activities are performed under the responsibilities of the Security Officer who is accountable for the overall
|
||||
Security Monitoring of the project and responds to the IM
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
199.473,36 €
|
||||
|
||||
Cost description: Infrastructure Manager
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
1.553.172,50 €
|
||||
|
||||
Cost description: Software analysis, development, test and operations; licenses; hardware; cloud storage and services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
|
||||
|
||||
|
||||
441 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [1 - Project and Impact Management]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
122.685,21 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Finance, Administration and Human Resources Management
|
||||
49 Activity short name
|
||||
1.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 1 Activity Duration 42
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Consiglio Nazionale delle
|
||||
OU short name 1 Participant
|
||||
Ricerche
|
||||
|
||||
52 Activity description
|
||||
This activity covers the following activities:
|
||||
●For financial aspects at least:
|
||||
○Collect budgetary requirements from all contract participants
|
||||
○Verifies the budgetary constraints of the WPs and the contract
|
||||
○Ensure the respects of the financial constraints of the PNRR context
|
||||
○Perform and monitor invoicing and payments
|
||||
●For administrative aspects at least:
|
||||
○Contact office for contract administration, ensuring centralised reachability via various communication channels, e.g. e–mail, telephone,
|
||||
|
||||
|
||||
442 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [1 - Project and Impact Management]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
○Contact office for contract administration, ensuring centralised reachability via various communication channels, e.g. e–mail, telephone,
|
||||
fax and post
|
||||
○Supports the Financial Officer in contract administration matters
|
||||
○Centralises and documents communication concerning the contract
|
||||
○Supports the Infrastructure Manager in the preparation of contract reports
|
||||
○Administrative management and follow–up of administrative requests
|
||||
○Support the Infrastructure Manager in the gathering and control of the timesheets
|
||||
●For Human Resources management aspects at least:
|
||||
○Perform human resource management activities, including contract management, salaries, holiday requests, etc.
|
||||
○Recruitment strategy targeting EXCELLENCE (See WP Summary of activities description)
|
||||
○Manage and maintain a network of ICT freelancers
|
||||
○Lead the recruitment process for new resources, including the pre-analysis of CVs, organisation of interviews, and finalisation of
|
||||
employment contract
|
||||
○Support the Infrastructure Manager in the Contract Capacity (Resources) Management
|
||||
To ensure the full respect of regulatory obligations (i.e. accounting codification, etc.) from an accounting-administrative point of view, the
|
||||
proponent is equipped with computerised recording and storage system of accounting data through which it is possible to obtain both prints
|
||||
and data extractions for the contract activities since the first day.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
43.500,00 €
|
||||
|
||||
Cost description: Administrative personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
97.000,00 €
|
||||
|
||||
Cost description: Transnational Access
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
9.835,00 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
|
||||
|
||||
443 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [1 - Project and Impact Management]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Finance, Administration and Human Resources Management
|
||||
49 Activity short name
|
||||
1.6
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 1 Activity Duration 42
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università di Napoli
|
||||
OU short name 4 Participant
|
||||
L’Orientale
|
||||
|
||||
52 Activity description
|
||||
This activity covers the following activities:
|
||||
●For financial aspects at least:
|
||||
○Collect budgetary requirements from all contract participants
|
||||
○Verifies the budgetary constraints of the WPs and the contract
|
||||
○Ensure the respects of the financial constraints of the PNRR context
|
||||
○Perform and monitor invoicing and payments
|
||||
●For administrative aspects at least:
|
||||
○Contact office for contract administration, ensuring centralised reachability via various communication channels, e.g. e–mail, telephone,
|
||||
fax and post
|
||||
○Supports the Financial Officer in contract administration matters
|
||||
○Centralises and documents communication concerning the contract
|
||||
○Supports the Infrastructure Manager in the preparation of contract reports
|
||||
○Administrative management and follow–up of administrative requests
|
||||
○Support the Infrastructure Manager in the gathering and control of the timesheets
|
||||
●For Human Resources management aspects at least:
|
||||
○Perform human resource management activities, including contract management, salaries, holiday requests, etc.
|
||||
○Recruitment strategy targeting EXCELLENCE (See WP Summary of activities description)
|
||||
○Manage and maintain a network of ICT freelancers
|
||||
○Lead the recruitment process for new resources, including the pre-analysis of CVs, organisation of interviews, and finalisation of
|
||||
employment contract
|
||||
○Support the Infrastructure Manager in the Contract Capacity (Resources) Management
|
||||
To ensure the full respect of regulatory obligations (i.e. accounting codification, etc.) from an accounting-administrative point of view, the
|
||||
proponent is equipped with computerised recording and storage system of accounting data through which it is possible to obtain both prints
|
||||
and data extractions for the contract activities since the first day.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
|
||||
|
||||
|
||||
|
||||
444 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [1 - Project and Impact Management]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
58.125,00 €
|
||||
|
||||
Cost description: Administrative personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
50.000,00 €
|
||||
|
||||
Cost description: Civil infrastructure
|
||||
54.5 e. Indirect costs
|
||||
7.568,75 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Finance, Administration and Human Resources Management
|
||||
49 Activity short name
|
||||
1.4
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 1 Activity Duration 42
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli studi di
|
||||
OU short name 2 Participant
|
||||
Modena e Reggio Emilia
|
||||
|
||||
|
||||
|
||||
|
||||
445 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [1 - Project and Impact Management]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
52 Activity description
|
||||
This activity covers the following activities:
|
||||
●For financial aspects at least:
|
||||
○Collect budgetary requirements from all contract participants
|
||||
○Verifies the budgetary constraints of the WPs and the contract
|
||||
○Ensure the respects of the financial constraints of the PNRR context
|
||||
○Perform and monitor invoicing and payments
|
||||
●For administrative aspects at least:
|
||||
○Contact office for contract administration, ensuring centralised reachability via various communication channels, e.g. e–mail, telephone,
|
||||
fax and post
|
||||
○Supports the Financial Officer in contract administration matters
|
||||
○Centralises and documents communication concerning the contract
|
||||
○Supports the Infrastructure Manager in the preparation of contract reports
|
||||
○Administrative management and follow–up of administrative requests
|
||||
○Support the Infrastructure Manager in the gathering and control of the timesheets
|
||||
●For Human Resources management aspects at least:
|
||||
○Perform human resource management activities, including contract management, salaries, holiday requests, etc.
|
||||
○Recruitment strategy targeting EXCELLENCE (See WP Summary of activities description)
|
||||
○Manage and maintain a network of ICT freelancers
|
||||
○Lead the recruitment process for new resources, including the pre-analysis of CVs, organisation of interviews, and finalisation of
|
||||
employment contract
|
||||
○Support the Infrastructure Manager in the Contract Capacity (Resources) Management
|
||||
To ensure the full respect of regulatory obligations (i.e. accounting codification, etc.) from an accounting-administrative point of view, the
|
||||
proponent is equipped with computerised recording and storage system of accounting data through which it is possible to obtain both prints
|
||||
and data extractions for the contract activities since the first day.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
244.125,00 €
|
||||
|
||||
Cost description: Administrative personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
197.500,00 €
|
||||
|
||||
Cost description: Transnational Access, FAIRification
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
|
||||
|
||||
|
||||
|
||||
446 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [1 - Project and Impact Management]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.5 e. Indirect costs
|
||||
34.413,75 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
50.000,00 €
|
||||
|
||||
Cost description: Anti-Laundering and other legal training for the personnel involved in the project; project management training;
|
||||
language courses
|
||||
48 Activity title
|
||||
Finance, Administration and Human Resources Management
|
||||
49 Activity short name
|
||||
1.5
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 1 Activity Duration 42
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity covers the following activities:
|
||||
●For financial aspects at least:
|
||||
○Collect budgetary requirements from all contract participants
|
||||
○Verifies the budgetary constraints of the WPs and the contract
|
||||
○Ensure the respects of the financial constraints of the PNRR context
|
||||
○Perform and monitor invoicing and payments
|
||||
●For administrative aspects at least:
|
||||
○Contact office for contract administration, ensuring centralised reachability via various communication channels, e.g. e–mail, telephone,
|
||||
fax and post
|
||||
○Supports the Financial Officer in contract administration matters
|
||||
○Centralises and documents communication concerning the contract
|
||||
○Supports the Infrastructure Manager in the preparation of contract reports
|
||||
○Administrative management and follow–up of administrative requests
|
||||
○Support the Infrastructure Manager in the gathering and control of the timesheets
|
||||
●For Human Resources management aspects at least:
|
||||
○Perform human resource management activities, including contract management, salaries, holiday requests, etc.
|
||||
○Recruitment strategy targeting EXCELLENCE (See WP Summary of activities description)
|
||||
○Manage and maintain a network of ICT freelancers
|
||||
|
||||
|
||||
|
||||
447 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [1 - Project and Impact Management]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
○Manage and maintain a network of ICT freelancers
|
||||
○Lead the recruitment process for new resources, including the pre-analysis of CVs, organisation of interviews, and finalisation of
|
||||
employment contract
|
||||
○Support the Infrastructure Manager in the Contract Capacity (Resources) Management
|
||||
To ensure the full respect of regulatory obligations (i.e. accounting codification, etc.) from an accounting-administrative point of view, the
|
||||
proponent is equipped with computerised recording and storage system of accounting data through which it is possible to obtain both prints
|
||||
and data extractions for the contract activities since the first day.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
177.978,41 €
|
||||
|
||||
Cost description: Administrative personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
150.000,00 €
|
||||
|
||||
Cost description: Long term rental
|
||||
54.5 e. Indirect costs
|
||||
18.758,49 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Impact Management
|
||||
49 Activity short name
|
||||
1.7
|
||||
|
||||
|
||||
|
||||
448 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [1 - Project and Impact Management]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 25 Activity Duration 18
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
RESILIENCE already developed an in-depth socio-economic ex ante impact study. This activity acts as a cooperative transversal and
|
||||
localised activity with all other WPs to develop an impact measurement methodology to identify, evaluate and quantify ITSERR impact
|
||||
in the long term in its different areas of actions.
|
||||
The impact ITSERR wants to have on Economy and Innovation is detailed in Annex B Section C, Article “Project framework and
|
||||
main expected impact” and covers the impact on the territory (i.e. by opting for a 50/50 distribution of the budget between North/South
|
||||
Italy), on business (i.e. by transforming research and prototypes into usable products), on methodologies (i.e. by introducing significant
|
||||
innovations in the research of the Religious Studies); on inclusivity (i.e. by supporting the availability of multilingual (meta)data to be
|
||||
inclusive when language-barriers prevent users from accessing resources within the European Research Area); on Public and Private
|
||||
institutions (i.e. by providing the opportunity to decrease the dispersion of funding allocated to individual small-scale infrastructural
|
||||
components and smaller projects) and on Green options (i.e. by reducing the costs dedicated to some aspects of the research through
|
||||
increased accessibility to resources as well as technical solutions to boost research performance)
|
||||
To that scope, the task participants:
|
||||
●Adopt RESILIENCE impact measurement framework (See Deliverable 1.4)and detail it according to the Italian context and
|
||||
ITSERR project
|
||||
●are involved in the activities of all other WPs to ensure the best insight on the work they conduct
|
||||
●define how to specify and measure the impact of the WPs and ITSERR outcomes in quantitative and qualitative terms
|
||||
●elaborate an impact assessment based on the RIs’ Impact Assessment Toolkit which identifies the impact indicators for
|
||||
RESILIENCE and particularly evaluates the impact of RESILIENCE on research, citizens and the different local and national
|
||||
contexts.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
124.796,37 €
|
||||
|
||||
Cost description: Administrative personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
|
||||
|
||||
|
||||
449 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [1 - Project and Impact Management]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
10.835,75 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Communication Management
|
||||
49 Activity short name
|
||||
1.8
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
Starting from the RESILIENCE Communication and Dissemination Plan (CDP) (See Deliverable 1.3), we will produce a CDP
|
||||
fully customised for the requirements and the national specificities of the ITSERR project. Moving from the latest version of the
|
||||
RESILIENCE C&D Plan, the team will :
|
||||
●define a differentiated strategy to reach out to the ITSERR users archetypes and especially to scholars
|
||||
●consult with institutions that already developed best practises in the field of communicating religious related topics (e.g. curators of
|
||||
religious heritage)
|
||||
●exploit the network of the ReIReS TNA grantholders to gain insights on how to (better) communicate the results of the ITSERR
|
||||
TNA Programme
|
||||
●Create and implement the ITSERR CDP
|
||||
●develop new or updated communication means
|
||||
●facilitate, stimulate and monitor the CDP activities
|
||||
|
||||
|
||||
|
||||
450 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [1 - Project and Impact Management]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
●elaborate a green approach to communication meetings, ensuring alternatives to physical meetings (which are also more financially
|
||||
sustainable).
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
93.036,64 €
|
||||
|
||||
Cost description: Administrative personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
10.012,56 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Training Management
|
||||
49 Activity short name
|
||||
1.9
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 4 Activity Duration 39
|
||||
|
||||
|
||||
|
||||
|
||||
451 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [1 - Project and Impact Management]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
Starting from the experience gained and materials provided by the ReIReS trainings and RESILIENCE training services, ITSERR
|
||||
management team will analyse the training resources (people, procedures, skills, tools, etc.) necessary to create a ITSERR training
|
||||
framework allowing the later establishment of future training programmes, providing tools and methods to support researchers in using
|
||||
RESILIENCE services and/or even creating their own training materials.
|
||||
|
||||
The team will define models of training to be provided by ITSERR and will provide guidelines for the partners involved in training
|
||||
activities and contains:
|
||||
●ITSERR the training requirements,
|
||||
●Training implementation guidelines
|
||||
●A traceability matrix between training activities and ITSERR staff needs in correlation with the objectives of the RI.
|
||||
●a series of templates to be used by the partners for the design, implementation and evaluation of the trainings
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
41.599,49 €
|
||||
|
||||
Cost description: Administrative personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
195.000,00 €
|
||||
|
||||
Cost description: Transnational access, FAIRification
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
15.161,96 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
|
||||
|
||||
|
||||
452 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [1 - Project and Impact Management]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
|
||||
|
||||
|
||||
|
||||
453 /453
|
||||
|
||||
|
|
@ -0,0 +1,210 @@
|
|||
|
||||
49 Activity short name
|
||||
2.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
There are various investigation techniques for arriving at clearer requirements. Considering that users are often unsure about the
|
||||
requirements, the support of a technical staff member is sometimes necessary. During the first months of the project, the DC Operations
|
||||
Team will gather the requirements avoiding the eventual problems that can occur in collecting requirements:
|
||||
●Lack of relevance to the objectives of the service
|
||||
●Lack of clarity or ambiguity in the wording
|
||||
●Duplication between requirements
|
||||
|
||||
At the end, the Service Level Requirements (See D2.1) will cover at least the following aspects:
|
||||
●ITSERR DCS plans and strategy
|
||||
●Vision, mission, goals, and objectives of the ITSERR as a Whole, and of the various WPs
|
||||
●Legislative requirements
|
||||
●Governance requirements
|
||||
●Budgeting and accounting requirements
|
||||
●Balanced scorecard
|
||||
●Service level requirements and targets
|
||||
●Service portfolio and service catalogue
|
||||
●Service review meetings
|
||||
●Customer satisfaction surveys
|
||||
●Continuous Services Improvement (CSI) initiatives already logged in the CSI register
|
||||
●Service models
|
||||
|
||||
|
||||
157 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [2 - Data Centre Services]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
●Service models
|
||||
●Service Design Package
|
||||
●Benchmark and baseline data
|
||||
●Risk assessments and risk mitigation plans
|
||||
|
||||
The Services Level Requirements document will be submitted for approval to the Infrastructure Manager and the Team Leaders and will
|
||||
be signed off before its analysis.
|
||||
From the SLR accepted, the DCS Operations Team will verify the pertinence of the Operations Management Policy (See Deliverable
|
||||
2.2) of RESILIENCE and propose to RESILIENCE team eventual updates. To obtain the best services support, the ITSERR
|
||||
DCS team will maintain regular contacts with the RESILIENCE DCS team during all phases of the project.
|
||||
Then the DCS team starts proposing solutions in terms of software and services. These are discussed with the various team members and
|
||||
the team starts designing a DCS solution architecture.
|
||||
|
||||
|
||||
|
||||
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
55.338,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.5 e. Indirect costs
|
||||
3.873,66 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
48 Activity title
|
||||
|
||||
|
||||
|
||||
|
||||
158 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [2 - Data Centre Services]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
DC Services Support
|
||||
49 Activity short name
|
||||
2.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
The DCS team prepares documentation and training material for the WP teams to ensure a shared knowledge of the management and
|
||||
security services and principles to be respected.
|
||||
They will also assist the WP teams during each phase of their activity (software development, testing and set in production).
|
||||
The DCS Team will be in close contact with the RESILIENCE DCS team to keep the shared documentation synchronised.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
189.819,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.5 e. Indirect costs
|
||||
|
||||
|
||||
|
||||
|
||||
159 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [2 - Data Centre Services]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
13.287,33 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
48 Activity title
|
||||
Data Centre Services Implementation
|
||||
49 Activity short name
|
||||
2.2
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 3 Activity Duration 40
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
The DCS ITSERR team synchronises periodically with the RESILIENCE team to verify the status of the DC services and software
|
||||
available on resilience-ri.eu.
|
||||
From this information, the software licence necessary to the set-up of the ITSERR services are ordered.
|
||||
Then the DCS team proceeds with the installation of the solutions (See an example in the annexed figure WP2.1) and starts testing
|
||||
their operationality. The team proceeds with the installation of the first mandatory environments including:
|
||||
●the project management environment including tools covering processes such planning, incident management, change management, staff
|
||||
time management, etc.
|
||||
●The WPs development environments including tools for version control, testing life cycle management, documentation lifecycle
|
||||
management, etc.
|
||||
●The operation management including tools for monitoring security, services capacity, services availability, logging, services performance,
|
||||
etc.
|
||||
|
||||
When the WPs teams will start deploying their software, a key mission of the DCS Team is to maintain operational and up-to-date the
|
||||
software stack required by each WP. Among this stack is the RESILIENCE Toolkit composed of new/existing, shared and re-usable
|
||||
components/services. As explained in WP3, and also in WP4 to WP10, the ITSERR Architecture and Design team will design all
|
||||
WPs software solutions and will make sure that each time it is possible, an identical functionality will only be developed once and
|
||||
eventually re-use existing code or software services already deployed in RESILIENCE or other RIs. During the pre-analysis of the WP
|
||||
scope, the ITSERR team already identified some components that will be potentially re-used as presented in the annexed figure WP2.4.
|
||||
54 Activity budget
|
||||
|
||||
|
||||
|
||||
|
||||
160 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [2 - Data Centre Services]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
1.435.287,40 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.5 e. Indirect costs
|
||||
100.470,12 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
|
||||
|
|
@ -0,0 +1,512 @@
|
|||
|
||||
114 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [3 - T-ReS - Toolkit for Religious Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
3.2.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli studi di
|
||||
OU short name 2 Participant
|
||||
Modena e Reggio Emilia
|
||||
|
||||
52 Activity description
|
||||
This activity is dedicated to the evaluation and supervision of domain-specific requirements for CRITERION, domain-specific testing of
|
||||
prototype and scientific coordination and support of Analysis and Development teams; its goal is to oversee and direct the development of
|
||||
CRITERION carried out in A3.2.1 and A3.3 in order to ensure that the prototype corresponds to the needs of the scientific
|
||||
community.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
213.887,44 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
14.972,12 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
Consumables, participation to events, dissemination, travels
|
||||
|
||||
|
||||
|
||||
115 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [3 - T-ReS - Toolkit for Religious Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Scientific preparation - IT/CRITERION
|
||||
49 Activity short name
|
||||
3.2.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Consiglio Nazionale delle
|
||||
OU short name 1 Participant
|
||||
Ricerche
|
||||
|
||||
52 Activity description
|
||||
This activity focuses on preparing and validating the development of IT components for T-ReS. Its goal is to assist and steer the
|
||||
development and analysis teams in software research and prototyping for CRITERION.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
|
||||
|
||||
|
||||
|
||||
116 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [3 - T-ReS - Toolkit for Religious Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
0,00 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Scientific preparation: GNORM-Talmud Bavli, domain-specific
|
||||
49 Activity short name
|
||||
3.2.5
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Consiglio Nazionale delle
|
||||
OU short name 1 Participant
|
||||
Ricerche
|
||||
|
||||
52 Activity description
|
||||
This activity is dedicated to the analysis and preparation of the Talmud Bavli corpus for GNORM; it prepares guidelines for corpus pre-
|
||||
processing for GNORM, as far as the Talmud Bavli case-study is concerned; it subsequently performs the corpus building and pre-
|
||||
processing for GNORM (Talmud Bavli), according to the specified guidelines; it also carries out domain-specific testing of the GNORM
|
||||
prototype, with relation to the Talmud Bavli corpus.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
82.500,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
|
||||
|
||||
|
||||
117 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [3 - T-ReS - Toolkit for Religious Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
66.222,09 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
17.883,05 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
106.750,00 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Development
|
||||
49 Activity short name
|
||||
3.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity has the goal of developing the software required for T-ReS tools, carrying out the following tasks:
|
||||
1)Architecture/Design: this activity has the goal of bringing different perspectives together in one team to improve problem solving and
|
||||
lead to smarter, more sustainable decision making and re-usable/cost-effective architectural/design components. The Architecture/Design
|
||||
task ensures that:
|
||||
|
||||
|
||||
118 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [3 - T-ReS - Toolkit for Religious Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
task ensures that:
|
||||
a)A RESILIENCE architecture and design common components repository is maintained
|
||||
b)A performant, secure, robust and stable architecture and design for the ITSERR software requirements is created.
|
||||
c)Respect of the architectural and design recommendations is guaranteed.
|
||||
2)CRITERION development: this task develops CRITERION as a WYSIWYG editor prototype, in cooperation with the scientific
|
||||
team in charge of A3.2.1. It also develops the plug-in system for CRITERION, and it produces a collation analysis plug-in.
|
||||
3)GNORM development: it develops the (meta)data extraction system for GNORM through algorithm optimisation and layout
|
||||
analysis solutions based on Computer Vision and Artificial Intelligence algorithms, to assist with the task of knowledge extraction
|
||||
algorithms, and to be used as additional inputs for the other developed tools. It also produces the architecture of the database where
|
||||
extracted properties are stored.
|
||||
4)GNORM visualisation: it develops a visualisation frontend for GNORM, to allow 3D visualisation and fruition according to users’
|
||||
needs and requirements.
|
||||
5)T-ReS, general: it develops a shared library for elements created for T-ReS and within other WPs, in order to maximise synergy
|
||||
between the IT tasks of ITSERR.
|
||||
All this is based upon DevSecOps to:
|
||||
●allow the deployment of code faster and in an automated way;
|
||||
●increase speed to delivery of applications and services;
|
||||
●ensure alignment of development and IT operations (WP2) (in the same way that agile aligns development and researchers);
|
||||
●and integrate security in the design process.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
1.487.778,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
104.144,46 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
|
||||
|
||||
|
||||
119 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [3 - T-ReS - Toolkit for Religious Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Test
|
||||
49 Activity short name
|
||||
3.4
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 6 Activity Duration 37
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity makes use of best of breed tools and techniques to rigorously test CRITERION and GNORM.
|
||||
Although this may look as an almost final stage, testing is actually part of an iterative process. The results thus generated during the
|
||||
testing phase are used to nurture researchers thinking to refine/broaden problems, complete their problem understanding, improve the
|
||||
conditions of use, etc.
|
||||
|
||||
Additionally, the test is run with the aid of domain-specific scholars, that provide high-profile feedback on the functionalities of
|
||||
CRITERION and GNORM, for the WYSIWYG editor in one case, and for the two case-studies (Corpus Iuris Canonici and
|
||||
Talmud Bavli) in the other. In addition, this activity tests the T-ReS shared library by coordinating with activities A3.3 and A3.2.1
|
||||
and with other WPs; finally, it collects feedback from users of CRITERION and GNORM prototypes, to assist in producing
|
||||
documentation for the prototypes.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
195.615,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
|
||||
|
||||
|
||||
|
||||
120 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [3 - T-ReS - Toolkit for Religious Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
13.693,05 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Operations
|
||||
49 Activity short name
|
||||
3.5
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli studi di
|
||||
OU short name 2 Participant
|
||||
Modena e Reggio Emilia
|
||||
|
||||
52 Activity description
|
||||
The operation activity ensures that the software produced in the WP is properly run, and prepares it for integration in the
|
||||
RESILIENCE infrastructure.
|
||||
It also sets up GNORM and the databases for the two case-studies (Corpus Iuris Canonici and Talmud Bavli) for Continuous
|
||||
Delivery, ensuring that the code, the databases and its attached material (documentation, training packages etc.) are always in a release-
|
||||
ready state.
|
||||
The ultimate culmination of this process is the Continuous Deployment. For CRITERION, it ensures that a dedicated community
|
||||
forum is set up, while for T-ReS it deploys the shared library in coordination with other WPs.
|
||||
Finally, it ensures that the prototypes of CRITERION and GNORM are released and published for the RESILIENCE
|
||||
marketplace.
|
||||
|
||||
|
||||
|
||||
121 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [3 - T-ReS - Toolkit for Religious Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
103.380,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
7.236,60 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Analysis and prototyping
|
||||
49 Activity short name
|
||||
3.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
|
||||
|
||||
|
||||
122 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [3 - T-ReS - Toolkit for Religious Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity is dedicated to the preliminary IT work for the development of T-ReS. The first stage has the aim of gaining an empathic
|
||||
understanding of the WP research topic by using the Design Thinking process.
|
||||
In particular, the activity explores and evaluates text editors capable of producing critical editions for CRITERION, and evaluates
|
||||
source material and suitable software tools for GNORM; it also analyses features required by a shared library for ITSERR software
|
||||
tools and, elaborates prototypes for the tools; finally, it produces scientific, user and technical requirements for T-ReS.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
172.500,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
136.620,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
34.490,67 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
123.603,95 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Scientific preparation - IT/GNORM
|
||||
|
||||
|
||||
|
||||
123 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [3 - T-ReS - Toolkit for Religious Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
Scientific preparation - IT/GNORM
|
||||
49 Activity short name
|
||||
3.2.2
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 6 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity focuses on preparing and validating the development of IT components for T-ReS. Its goal is to assist and steer the
|
||||
development and analysis teams in algorithmic research for GNORM.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
146.250,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
12.463,64 €
|
||||
|
||||
|
||||
|
||||
|
||||
124 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [3 - T-ReS - Toolkit for Religious Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
61.801,98 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Scientific preparation: GNORM-Corpus Iuris Canonici, domain-specific
|
||||
49 Activity short name
|
||||
3.2.4
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 8 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity is dedicated to:
|
||||
1) the analysis and preparation of guidelines for corpus pre-processing for GNORM - Corpus iuris canonici;
|
||||
2)application of guidelines and corpus building for GNORM (Corpus iuris canonici);
|
||||
3)domain-specific supervision on the testing of the prototype with relation to the Corpus Iuris Canonici case-study.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
146.250,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
|
||||
|
||||
125 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [3 - T-ReS - Toolkit for Religious Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
12.463,64 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
61.801,98 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
|
||||
|
||||
|
|
@ -0,0 +1,534 @@
|
|||
|
||||
49 Activity short name
|
||||
4.2.4
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
|
||||
|
||||
|
||||
202 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [4 - DaMSym - Data Mining: the Nicene-
|
||||
Constantinopolitan Symbolum]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 7 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity carries out corpus pre-processing on the Greek and Latin texts of the Creed, to prepare them for analysis through
|
||||
DaMSym.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
8.652,28 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
123.603,95 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Scientific preparation/Pre-processing, translations
|
||||
|
||||
|
||||
|
||||
203 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [4 - DaMSym - Data Mining: the Nicene-
|
||||
Constantinopolitan Symbolum]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
49 Activity short name
|
||||
4.2.5
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Consiglio Nazionale delle
|
||||
OU short name 1 Participant
|
||||
Ricerche
|
||||
|
||||
52 Activity description
|
||||
This activity carries out corpus pre-processing on the texts of the Creed in the translations defined in A4.2.1 and A4.2.2, to prepare
|
||||
them for analysis through DaMSym.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
82.500,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
66.222,09 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
17.883,05 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
|
||||
|
||||
|
||||
204 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [4 - DaMSym - Data Mining: the Nicene-
|
||||
Constantinopolitan Symbolum]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
106.750,00 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Scientific preparation/IT
|
||||
49 Activity short name
|
||||
4.2.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 6 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity carries out research on software tools for word embedding and platforms for standoff annotation; in a second stage, it oversees
|
||||
the development activity (A4.3) in its realisation/adaptation of software tools for word embedding and platforms for standoff annotation,
|
||||
ensuring that it remains in line with the scientific principles formulated in A4.1.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
|
||||
|
||||
205 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [4 - DaMSym - Data Mining: the Nicene-
|
||||
Constantinopolitan Symbolum]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
4.326,14 €
|
||||
|
||||
Cost description: Costs of PhD scholarships not included in item (a); Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
61.801,98 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Scientific preparation/general
|
||||
49 Activity short name
|
||||
4.2.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli studi di
|
||||
OU short name 2 Participant
|
||||
Modena e Reggio Emilia
|
||||
|
||||
52 Activity description
|
||||
This activity encompasses all the tasks related to domain-specific requirements and expertise.
|
||||
This activity provides scientific, domain-specific supervision and coordination for the other WP activities and it validates technical and
|
||||
scientific requirements, with the assistance of domain-specific experts for IT and for Religious Studies and by coordinating with other WP
|
||||
activities.
|
||||
It checks that software development and corpus preparation are performed in accordance with the technical and domain-specific
|
||||
requirements, and it assists in updating these requirements when needed.
|
||||
54 Activity budget
|
||||
|
||||
|
||||
|
||||
206 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [4 - DaMSym - Data Mining: the Nicene-
|
||||
Constantinopolitan Symbolum]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
27.912,56 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
75.975,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
15.641,33 €
|
||||
|
||||
Cost description: Costs of PhD scholarships not included in item (a); Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
119.560,00 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Operations
|
||||
49 Activity short name
|
||||
4.5
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
|
||||
|
||||
207 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [4 - DaMSym - Data Mining: the Nicene-
|
||||
Constantinopolitan Symbolum]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
The operation activity collects the deliverables created in the other WP activities and ensures that they are properly functioning, and
|
||||
prepares them for integration in the RESILIENCE infrastructure. It also sets up DaMSym and the database on the Creed for
|
||||
Continuous Delivery, ensuring that the code, the databases and its attached material (documentation, training packages etc.) are always
|
||||
in a release-ready state. The ultimate culmination of this process is the Continuous Deployment.
|
||||
In particular, the operation activity carries out the following tasks:
|
||||
1)It provides that technical documents and whitepapers are produced and published for DaMSym, based on the works of A4.1-A4.4.
|
||||
2)It provides that DaMSym goes into production and that the database for the Creed powered by DaMSym is published for
|
||||
RESILIENCE-RI.EU.
|
||||
It provides that DaMSym’s source code and binaries are packaged as Open Source software for publication to the RESILIENCE
|
||||
software marketplace.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
0,00 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
|
||||
|
||||
|
||||
|
||||
208 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [4 - DaMSym - Data Mining: the Nicene-
|
||||
Constantinopolitan Symbolum]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Test
|
||||
49 Activity short name
|
||||
4.4
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 6 Activity Duration 37
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity makes use of best of breed tools and techniques to rigorously test DaMSym. Although this may look as an almost final
|
||||
stage, testing is actually part of an iterative process.
|
||||
The results thus generated during the testing phase are used to nurture researchers thinking to refine/broaden problems, complete their
|
||||
problem understanding, improve the conditions of use, etc. Additionally, the test is run with the aid of domain-specific scholars, who
|
||||
provide high-profile feedback on the functionalities of DaMSym, for research on the two case-studies. Even during this stage, therefore,
|
||||
updates are made in order to rule out problems and derive an as deep as possible, clear understanding of the ITSERR services/products
|
||||
offered to the researchers.
|
||||
In particular, DaMSym is tested first in its components (word embedding, properties database, annotation), in order to assess KPIs and
|
||||
assist the Development activity (A4.3), then DaMSym is tested its pre-release form (as a full software tool for analysis of the Creed), for
|
||||
collecting user and scientific feedback.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
97.807,04 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
|
||||
|
||||
|
||||
209 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [4 - DaMSym - Data Mining: the Nicene-
|
||||
Constantinopolitan Symbolum]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
6.846,49 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Development
|
||||
49 Activity short name
|
||||
4.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity aims at finalising all the work validated by the previous phases, through the following tasks:
|
||||
1)Architecture/Design: this task brings different perspectives together in one team to improve problem solving and lead to smarter, more
|
||||
sustainable decision making and re-usable/cost-effective architectural/design components. The Architecture/Design task ensures that:
|
||||
a)A RESILIENCE architecture and design common components repository is maintained
|
||||
|
||||
|
||||
|
||||
210 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [4 - DaMSym - Data Mining: the Nicene-
|
||||
Constantinopolitan Symbolum]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
a)A RESILIENCE architecture and design common components repository is maintained
|
||||
b)A performant, secure, robust and stable architecture and design for the ITSERR software requirements is created.
|
||||
c)Respect of the architectural and design recommendations is guaranteed.
|
||||
2)Training of the identified tool(s) for word embedding on the target languages, collecting training data from freely-available sources and
|
||||
from the digital texts collected in A4.2
|
||||
3)Optimisation and fine-tuning of the most performant toolkit component for word embedding on original texts, and on the translations
|
||||
(at least 5 languages in 3 different non-Latin and non-Greek alphabets).
|
||||
4)Development and training of text understanding and classification tools for the digital texts collected in A4.2, on the basis of an
|
||||
assessment of existing neural network architectures (e.g. GPTx-like)
|
||||
5)Development of an API that turns word embedding vector clusters into properties stored in a graph database (such as Neo4J).
|
||||
6)Development of an API for automatically annotating the vector clusters contained in the database as standoff properties in texts of the
|
||||
corpus.
|
||||
7)Development of a machine translation API, specifically developed on the textual corpora of the use-case.
|
||||
8)Development of a text classification API, specifically developed on the textual corpora of the use-case.
|
||||
9)Implementation of functions for the standoff properties platform, in synergy with the T-ReS library, to be performed on the whole set of
|
||||
different language corpora, and finalisation of DaMSym as an accessible software prototype for researchers and other users.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
800.538,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
56.037,65 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
|
||||
|
||||
211 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [4 - DaMSym - Data Mining: the Nicene-
|
||||
Constantinopolitan Symbolum]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Analysis and prototyping
|
||||
49 Activity short name
|
||||
4.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity is dedicated to the preliminary work for the development of DaMSym.
|
||||
The first stage has the aim of gaining an empathic understanding of the WP research topic by using the Design Thinking process. This
|
||||
involves consulting researchers and experts internal and/or external to ITSERR to find out more about the corpus of interest related to
|
||||
the Nicene-Constantinopolitan Creed, through engaging with researchers to produce a recognition of the corpus, analysing the digital and
|
||||
non digital texts to be included and expressing the research issues involved.
|
||||
To this end, scientific requirements and user-related requirements are laid out in this activity, for the corpus on the Creed and for
|
||||
DaMSym as a software.
|
||||
In parallel, digital resources for the languages involved are analysed, and tools for the required text processing functions (word embedding
|
||||
extraction, properties database organisation, standoff properties platform) are explored.
|
||||
This results in a formulation of technical requirements for DaMSym and its corpus.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
85.905,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
|
||||
|
||||
|
||||
212 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [4 - DaMSym - Data Mining: the Nicene-
|
||||
Constantinopolitan Symbolum]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
6.013,34 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Scientific preparation/case-study
|
||||
49 Activity short name
|
||||
4.2.2
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity has the goal of collecting the corpus for the Creed and its translations, ensuring that each text (or translation) of the Creed
|
||||
can be compared with a sizeable corpus of literature of the same language and of the same period as each text (or translation).
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
|
||||
|
||||
|
||||
213 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [4 - DaMSym - Data Mining: the Nicene-
|
||||
Constantinopolitan Symbolum]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
277.500,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
20.601,14 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
61.801,98 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
|
||||
|
|
@ -0,0 +1,457 @@
|
|||
|
||||
49 Activity short name
|
||||
5.2.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Consiglio Nazionale delle
|
||||
OU short name 1 Participant
|
||||
Ricerche
|
||||
|
||||
52 Activity description
|
||||
This activity defines text acquisition/OCR techniques for assisting/automating text extraction; it also explores exploiting object fusion
|
||||
techniques, based on fuzzy matching for aligning/merging the outputs of different OCR tools, in order to maximise the efficiency of the
|
||||
Development team.
|
||||
54 Activity budget
|
||||
|
||||
|
||||
|
||||
232 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [5 - Digital Maktaba]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
82.500,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
66.222,09 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
17.883,05 €
|
||||
|
||||
Cost description: Costs covering PhD scholarships not included in item (a); Consumables, participation to events, dissemination,
|
||||
travels
|
||||
54.6 f. Training activities
|
||||
106.750,00 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Scientific preparation/Extraction
|
||||
49 Activity short name
|
||||
5.2.2
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
|
||||
|
||||
|
||||
233 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [5 - Digital Maktaba]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
Università degli studi di
|
||||
OU short name 3 Participant
|
||||
Modena e Reggio Emilia
|
||||
|
||||
52 Activity description
|
||||
The goal of this activity is the definition of techniques for extracting syntactic metadata, through the following tasks:
|
||||
●Definition of knowledge extraction techniques for linguistic / semantic metadata:
|
||||
●exploiting multilingual resources
|
||||
●exploiting techniques for title and author automatic recognition.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
120.900,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
21.016,80 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
179.340,00 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Operations
|
||||
|
||||
|
||||
|
||||
234 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [5 - Digital Maktaba]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Operations
|
||||
49 Activity short name
|
||||
5.5
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli studi di
|
||||
OU short name 3 Participant
|
||||
Modena e Reggio Emilia
|
||||
|
||||
52 Activity description
|
||||
This activity ensures that Digital Maktaba goes into operation and is properly set up, and that, from a data management perspective, big
|
||||
data management techniques and tools are properly applied to the database for storing the extracted data and metadata. Special focus is
|
||||
given to the data interchange and long-term preservation aspects, in order to allow data interchange with catalogue data from other
|
||||
libraries and make the managed data readable and usable also on a long-term basis.
|
||||
Finally, a web portal for Digital Maktaba is constructed, with video and content to report on the progress of the project Digital Maktaba
|
||||
is prepared, and the portal is published on RESILIENCE. The Digital Maktaba engine is also prepared for publishing in the
|
||||
RESILIENCE marketplace.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
318.827,75 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
|
||||
|
||||
|
||||
235 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [5 - Digital Maktaba]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.5 e. Indirect costs
|
||||
22.317,94 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Test
|
||||
49 Activity short name
|
||||
5.4
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 6 Activity Duration 37
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity has the goal of integrating and testing the solutions proposed and developed in A5.1-A5.3, carrying out the following tasks:
|
||||
●T5.4.1 [M 24-26] Integration of the solutions developed in WP2 and WP3 in the system prototype
|
||||
●T5.4.2 [M 26-28] Validation in terms of accuracy and completeness of the information extracted.
|
||||
●T5.4.3 [M 28-30] Use case workshop
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
195.615,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
|
||||
|
||||
|
||||
|
||||
236 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [5 - Digital Maktaba]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
13.693,05 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Development
|
||||
49 Activity short name
|
||||
5.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli studi di
|
||||
OU short name 3 Participant
|
||||
Modena e Reggio Emilia
|
||||
|
||||
52 Activity description
|
||||
This activity carries out the IT development for tools necessary for Data Management, Interactive Search and Supervised Cataloguing,
|
||||
performing the following tasks:
|
||||
●T5.3.1 [M 14-18] design of a database for storing the extracted catalogue data and metadata, including data management techniques
|
||||
for interfacing / interchange with catalogue data from other libraries and exploiting:
|
||||
○Long term preservation practices
|
||||
○Big data management / distributed
|
||||
●T5.3.2 [M16-20] definition of advanced search techniques (including approximate and full-text search) for searching archive data
|
||||
●T5.3.3 [M16-22] design of a web user interface for cataloguing new documents and searching the archive
|
||||
|
||||
|
||||
237 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [5 - Digital Maktaba]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
●T5.3.3 [M16-22] design of a web user interface for cataloguing new documents and searching the archive
|
||||
●T5.3.4 [M16-24] definition of intelligent assistance techniques based on similarity search and supervised (incremental and
|
||||
interpretable) ML algorithms:
|
||||
○to assist data entering also based on suggestions from user feedback and previously entered data
|
||||
○to automate publication type recognition
|
||||
○to ensure that the prototype can "learn" and become more and more automated and effective with use
|
||||
●T5.3.5 [M 25-26] Validation of algorithms on samples of materials found in A5.1 and on corpora existing in the literature.
|
||||
|
||||
ITSERR development activity is based upon DevSecOps to:
|
||||
●allow the deployment of code faster and in an automated way;
|
||||
●increase speed to delivery of applications and services;
|
||||
●ensure alignment of development and IT operations (WP2) (in the same way that agile aligns development and researchers);
|
||||
●and integrate security in the design process.
|
||||
Agile DevSecOps is compatible with Continuous Integration / Continuous Deployment (CI/CD) principles, ensuring that the software
|
||||
can be reliably released any time. The goal is that all software components are merged into the main branch as often as possible, passing
|
||||
automated tests before each commit. CI/CD does not replace User Acceptance Testing, but quickly provides incremental releases, using
|
||||
as much automation as possible.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
829.775,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
58.084,25 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
|
||||
|
||||
238 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [5 - Digital Maktaba]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Scientific preparation/Validation
|
||||
49 Activity short name
|
||||
5.2.4
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 6 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity carries out supervision and validation of the developing/developed recognition and extraction techniques, both on samples of
|
||||
materials found in A5.1 and on larger corpora, available in the literature and provided by partner institutions.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
|
||||
|
||||
|
||||
|
||||
239 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [5 - Digital Maktaba]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.5 e. Indirect costs
|
||||
4.326,14 €
|
||||
|
||||
Cost description: Costs covering costs of PhD scholarships not included in item (a); Consumables, participation to events,
|
||||
dissemination, travels
|
||||
54.6 f. Training activities
|
||||
61.801,98 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Analysis
|
||||
49 Activity short name
|
||||
5.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity is dedicated to carrying out tasks of analysis and evaluation of the main challenges posed by Digital Maktaba, and setting
|
||||
the roadmap on how to face them. It is articulated as follows:
|
||||
●T5.1.1 [M 1-6] Preliminary activity of recognition of the operational scenario, focusing on the problems from both the IT and the
|
||||
historical-critical, linguistic perspective
|
||||
●T5.1.2 [M 1-6] Preliminary recognition of:
|
||||
○OCR tools and technologies for the languages considered by the project linguistic tools (multi-lingual resources such as dictionaries,
|
||||
thesauri, tools for processing text) available in the languages considered by the project
|
||||
○text mining techniques
|
||||
○long term preservation of digital documents techniques
|
||||
○big data management tools/techniques
|
||||
○(interpretable) machine learning techniques
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
|
||||
|
||||
|
||||
240 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [5 - Digital Maktaba]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
171.810,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
12.026,69 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Scientific preparation/Database Architecture
|
||||
49 Activity short name
|
||||
5.2.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
|
||||
|
||||
|
||||
241 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [5 - Digital Maktaba]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
This activity is tasked with the definition of requirements and specification for a database capable of storing the extracted catalogue data
|
||||
and metadata. The database, according to the specifications designed in this activity, is to be successively implemented in A5.3.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
151.250,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
12.463,64 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
61.801,98 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
|
||||
|
||||
|
|
@ -0,0 +1,482 @@
|
|||
|
||||
49 Activity short name
|
||||
6.2.2
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli studi di
|
||||
OU short name 2 Participant
|
||||
Modena e Reggio Emilia
|
||||
|
||||
52 Activity description
|
||||
This activity ensures that specific data sources are picked for the Sanctuaria test case, and prepared as datasets for YASMINE. It also
|
||||
prepares the identified data sources for the Sanctuaria test case to produce a scientifically relevant sample on which YASMINE can be
|
||||
developed and later tested.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
|
||||
|
||||
|
||||
|
||||
263 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [6 - YASMINE - Yet Another visual-Semantic
|
||||
Metascraper for Intelligent kNowledge Extraction]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
8.369,20 €
|
||||
|
||||
Cost description: Costs of PhD scholarships not included in item (a); Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
119.560,00 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Scientific preparation/IT
|
||||
49 Activity short name
|
||||
6.2.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli studi di
|
||||
OU short name 3 Participant
|
||||
Modena e Reggio Emilia
|
||||
|
||||
52 Activity description
|
||||
|
||||
|
||||
|
||||
264 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [6 - YASMINE - Yet Another visual-Semantic
|
||||
Metascraper for Intelligent kNowledge Extraction]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
This activity ensures that algorithms for semantic structure analysis and for data mapping are experimented and researched for use and
|
||||
optimisation within YASMINE. It also experiments algorithms for knowledge extraction, and algorithms semantic structure analysis
|
||||
and for data mapping. The task is performed jointly by domain-specific experts (i.e. related to Religious Studies) and by IT experts, to
|
||||
assist the development activity (A6.3).
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
241.800,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
42.033,60 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
358.680,00 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Scientific preparation/Coordination
|
||||
49 Activity short name
|
||||
6.2.4
|
||||
|
||||
|
||||
|
||||
|
||||
265 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [6 - YASMINE - Yet Another visual-Semantic
|
||||
Metascraper for Intelligent kNowledge Extraction]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Consiglio Nazionale delle
|
||||
OU short name 1 Participant
|
||||
Ricerche
|
||||
|
||||
52 Activity description
|
||||
For general scientific preparation and coordination, this activity ensures that the material experimented in A6.2.2 and collected in
|
||||
A6.2.1 is checked with the principles formulated in A6.1; additionally, coordination and assistance is provided between A6.2.1 and
|
||||
A6.2.2 on one side, and A6.3 on the other. It also verifies the status and adequacy of the data sources identified in A6.1, and validates
|
||||
the technical, scientific and user-related requirements emerged in that activity. For the subsequent phases, it also ensures that the IT
|
||||
development tasks are carried out in accordance with the scientific requirements.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
82.500,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
66.222,09 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
17.883,05 €
|
||||
|
||||
Cost description: Costs of PhD scholarships not included in item (a); Consumables, participation to events, dissemination, travels
|
||||
|
||||
|
||||
|
||||
266 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [6 - YASMINE - Yet Another visual-Semantic
|
||||
Metascraper for Intelligent kNowledge Extraction]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.6 f. Training activities
|
||||
106.750,00 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Analysis and Prototyping
|
||||
49 Activity short name
|
||||
6.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity is dedicated to the preliminary scientific and technical work for the development of YASMINE. The first stage has the aim
|
||||
of gaining an empathic understanding of the WP research topic by using the Design Thinking process. This involves consulting researchers
|
||||
and experts internal and/or external to ITSERR to find out more about the databases of interest for the Sanctuaria and the Plorabunt
|
||||
test cases, through engaging with researchers to understand their needs, experiences and motivations so to gain a deeper personal
|
||||
understanding of the research issues involved. To this end, scientific requirements and user-related requirements are laid out in this
|
||||
activity.
|
||||
From a technical point of view, requirements of the capabilities of YASMINE and of the data being processed are laid out by IT
|
||||
experts, taking into account the scientific and user-related requirements. In particular, YASMINE must result in a metascraper capable
|
||||
of combining a semantic and a mapping layer: the semantic layer is obtained through application of the semantic structure analysis model
|
||||
with a specifically developed software that must be capable of being trained.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
85.905,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
|
||||
|
||||
|
||||
267 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [6 - YASMINE - Yet Another visual-Semantic
|
||||
Metascraper for Intelligent kNowledge Extraction]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
6.013,34 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Operation
|
||||
49 Activity short name
|
||||
6.5
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli studi di
|
||||
OU short name 3 Participant
|
||||
Modena e Reggio Emilia
|
||||
|
||||
52 Activity description
|
||||
The operation activity ensures that the software produced by the WP is prepared for integration in the RESILIENCE infrastructure. It
|
||||
also sets up YASMINE and the databases for the two case-studies for Continuous Delivery, ensuring that the code, the databases and
|
||||
its attached material (documentation, training packages etc.) are always in a release-ready state. The ultimate culmination of this process
|
||||
is the Continuous Deployment.
|
||||
|
||||
|
||||
|
||||
268 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [6 - YASMINE - Yet Another visual-Semantic
|
||||
Metascraper for Intelligent kNowledge Extraction]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
is the Continuous Deployment.
|
||||
In particular, the operation activity carries out the following tasks:
|
||||
1)It provides that YASMINE goes into production as a RESILIENCE-RI.EU hosted service and that the databases for Sanctuaria
|
||||
and Plorabunt are published for RESILIENCE-RI.EU.
|
||||
2)It provides that YASMINE’s source code and binaries are packaged as Open Source software for publication to RESILIENCE
|
||||
software marketplace.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
291.422,75 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
20.399,59 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Test
|
||||
49 Activity short name
|
||||
6.4
|
||||
|
||||
|
||||
|
||||
269 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [6 - YASMINE - Yet Another visual-Semantic
|
||||
Metascraper for Intelligent kNowledge Extraction]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 6 Activity Duration 37
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity makes use of best of breed tools and techniques to rigorously test YASMINE. Although this may look as an almost final
|
||||
stage, testing is actually part of an iterative process. The results thus generated during the testing phase are used to nurture researchers
|
||||
thinking to refine/broaden problems, complete their problem understanding, improve the conditions of use, etc. Additionally, the test is
|
||||
run with the aid of domain-specific scholars, providing high-profile feedback on the functionalities of YASMINE, for research on the two
|
||||
case-studies. Even during this stage, therefore, updates are made to rule out problems and derive an as deep as possible, clear
|
||||
understanding of the ITSERR services/products offered to the researchers.
|
||||
More specifically this activity covers the following tasks:
|
||||
1.It sets up a FAIR data repository for the semantic and mapping layers, improved with the experience developed during the test phase
|
||||
itself.
|
||||
2.It runs YASMINE’s prototype on the two case-studies, and tests it with IT personnel and with the scientific community, collecting
|
||||
feedback necessary for improving the prototype, for improving the documentation, and for producing training material.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
97.807,50 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
|
||||
|
||||
|
||||
270 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [6 - YASMINE - Yet Another visual-Semantic
|
||||
Metascraper for Intelligent kNowledge Extraction]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.5 e. Indirect costs
|
||||
6.846,53 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Development
|
||||
49 Activity short name
|
||||
6.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity has the goal of finalising all the work validated by the analysis and prototyping phase and by the scientific preparation
|
||||
phase, through the following tasks:
|
||||
1)Architecture/Design: this activity has the goal of bringing different perspectives together in one team to improve problem solving and
|
||||
lead to smarter, more sustainable decision making and re-usable/cost-effective architectural/design components. In particular, the
|
||||
Architecture/Design task ensures that:
|
||||
a)A RESILIENCE architecture and design common components repository is maintained
|
||||
b)A performant, secure, robust and stable architecture and design for the ITSERR software requirements is created.
|
||||
c)Respect of the architectural and design recommendations is guaranteed.
|
||||
2)It designs and develops Computer Vision and Artificial Intelligent algorithms to automatically extract additional information that can
|
||||
be used to enrich the collected data. Examples of such algorithms are the automatic tagging of images and videos, the description in
|
||||
natural language (i.e. automatic captioning) of their visual content, and the visual-textual search through the comparison by similarity of
|
||||
visual/textual embeddings. Extracted metadata will be used as additional inputs for the YASMINE prototype.
|
||||
3)It develops layout analysis solutions based on Computer Vision and Artificial Intelligence algorithms, to assist with the task of
|
||||
knowledge extraction algorithms, and to be used as additional inputs for the other developed tools.
|
||||
4)It develops a tool capable of mapping web pages semantically, creating a semantic layer. This layer, in turn, serves as a medium for
|
||||
putting in communication web pages in different languages and with different structures.
|
||||
5)It develops a data mapper, i.e. a tool capable of interpreting the semantic layer and mapping its elements to data objects into a new
|
||||
mapping layer.
|
||||
|
||||
|
||||
|
||||
271 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [6 - YASMINE - Yet Another visual-Semantic
|
||||
Metascraper for Intelligent kNowledge Extraction]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
mapping layer.
|
||||
6)It develops the metascraper prototype, i.e. YASMINE itself, combining the semantic and mapping layers.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
460.023,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
32.201,61 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Scientific preparation/Case-study
|
||||
49 Activity short name
|
||||
6.2.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
|
||||
|
||||
|
||||
272 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [6 - YASMINE - Yet Another visual-Semantic
|
||||
Metascraper for Intelligent kNowledge Extraction]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity ensures that specific data sources are picked for the Plorabunt test case, and prepared as datasets for YASMINE. It also
|
||||
prepares the identified data sources for the Plorabunt test case, in order to produce a scientifically relevant sample on which YASMINE
|
||||
can be developed and later tested
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
152.500,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
20.601,14 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
61.801,98 €
|
||||
|
||||
|
||||
|
||||
273 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [6 - YASMINE - Yet Another visual-Semantic
|
||||
Metascraper for Intelligent kNowledge Extraction]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
61.801,98 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
|
||||
|
|
@ -0,0 +1,451 @@
|
|||
|
||||
49 Activity short name
|
||||
7.2.4
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli studi di
|
||||
OU short name 2 Participant
|
||||
Modena e Reggio Emilia
|
||||
|
||||
52 Activity description
|
||||
This activity provides scientific, domain-specific supervision and coordination for the other WP activities. In particular, it ensures that
|
||||
domain-specific and case-study-specific expertise is accessed to guarantee the high scientific profile of the WP. It also ensures that the IT
|
||||
development tasks are carried out in accordance with the scientific requirements. To this end, involvement of scholars accustomed to the
|
||||
regesta and IT personnel is necessary.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
120.900,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
|
||||
|
||||
|
||||
|
||||
295 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [7 - REVER - REVErse Regesta]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.5 e. Indirect costs
|
||||
8.463,00 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs not included in item (a); Consumables,
|
||||
participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Development
|
||||
49 Activity short name
|
||||
7.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli studi di
|
||||
OU short name 3 Participant
|
||||
Modena e Reggio Emilia
|
||||
|
||||
52 Activity description
|
||||
This activity has the goal of finalising all the work validated by the analysis and prototyping phase and by the scientific preparation
|
||||
phase, through the following tasks:
|
||||
1)Architecture/Design: this activity has the goal of bringing different perspectives together in one team to improve problem solving and
|
||||
lead to smarter, more sustainable decision making and re-usable/cost-effective architectural/design components. In particular, the
|
||||
Architecture/Design task ensures that:
|
||||
a)A RESILIENCE architecture and design common components repository is maintained
|
||||
b)A performant, secure, robust and stable architecture and design for the ITSERR software requirements is created.
|
||||
c)Respect of the architectural and design recommendations is guaranteed.
|
||||
2)It develops custom tools for handwritten recognition, and assessment/re-training of available OCR tools for document pre-processing
|
||||
and digitalization
|
||||
3)It develops and optimises an algorithm for automatically linking domain-specific summaries with a standardised structure (the regesta)
|
||||
to the document they summarise. To do this, it builds on page-segmentation software (such as CVAT) with the use of neural networks,
|
||||
that are optimised and trained to link each regestum entry to the document in the corpus it refers to.
|
||||
4)It develops text ranking and text summarisation algorithms to make them capable of being trained through machine learning and of
|
||||
producing regesta-like entries from full sources. To perform this task, existing text summarisation software must be significantly improved.
|
||||
In this activity, text-summarisation and text-ranking algorithms are combined and provided with machine-learning capacities.
|
||||
5)It combines the regesta>source and the source>regesta algorithms with a user interface that allows to visualise and browse the
|
||||
documents of the corpus and the related regesta, significantly enhancing the research experience.
|
||||
|
||||
|
||||
|
||||
296 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [7 - REVER - REVErse Regesta]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
documents of the corpus and the related regesta, significantly enhancing the research experience.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
511.587,50 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
35.811,13 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Test
|
||||
49 Activity short name
|
||||
7.4
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 6 Activity Duration 37
|
||||
|
||||
|
||||
|
||||
|
||||
297 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [7 - REVER - REVErse Regesta]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity encompasses all the tasks that are necessary for deploying and running the WP operations. In particular:
|
||||
1)It carries out and evaluates machine learning for the algorithms developed in activity 7.3
|
||||
2)It sets up the REVER prototype and deploys it, ensuring that it is tested by a sample of the scholarly community to collect feedback for
|
||||
further improvement throughout the final release. Basic training in the use of the prototype is provided by the staff who worked at its
|
||||
development, with extensive support and Q&A sessions between developers and users. The collected feedback is not only used for
|
||||
ameliorating REVER, but also for designing its manual and documentation.
|
||||
3)It produces technical and user documentation: to this end, guidelines for pre-processing of the corpus and instructions for using
|
||||
REVER are combined in order to produce a clear, exhaustive and easily browsable documentation, ideally in the form of a wiki.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
97.807,50 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
6.846,53 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
|
||||
|
||||
298 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [7 - REVER - REVErse Regesta]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Operation
|
||||
49 Activity short name
|
||||
7.5
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli studi di
|
||||
OU short name 3 Participant
|
||||
Modena e Reggio Emilia
|
||||
|
||||
52 Activity description
|
||||
The operation activity collects the deliverables created in the other WP activities and ensures that they are properly functioning, and
|
||||
prepares them for integration in the RESILIENCE infrastructure.
|
||||
In particular:
|
||||
1)It provides that technical documents and whitepapers are produced and published for REVER’s use case (i.e. its application to the
|
||||
Regesta Pontificum Romanorum).
|
||||
2)It provides that REVER goes into production as a RESILIENCE-RI.EU hosted service and the Regesta Pontificum Romanorum
|
||||
is published as an online and browsable tool.
|
||||
3)It provides that REVER's source code and binaries are packaged as Open Source software for publication to software marketplaces
|
||||
such as EOSC/SSHOC, CLARIN, RESILIENCE, etc.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
75.975,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
|
||||
|
||||
|
||||
299 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [7 - REVER - REVErse Regesta]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
5.318,25 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Analysis and Prototyping
|
||||
49 Activity short name
|
||||
7.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity is focused on analysis of the material relating to REVER, both in terms of data and in terms of developed software. It is
|
||||
deployed in three main tasks:
|
||||
1)It analyses the case-study corpus, represented by the Regesta Pontificum Romanorum, laying out the technical, scientific and user-related
|
||||
requirements for REVER to operate on that corpus.
|
||||
2)Building from the experience developed throughout the collection and the preparation of the corpus for the case-study, it lays out
|
||||
principles for general guidelines for corpus pre-processing.
|
||||
3)The software optimised in the other WP activities is analysed and evaluated in order to ensure the achievement of the necessary KPIs.
|
||||
Building from feedback obtained through testing and domain-specific analyses (for IT, for Religious Studies, and for the corpus of the
|
||||
case-study) it also updates technical, scientific and user-related requirements for REVER.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
|
||||
|
||||
|
||||
300 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [7 - REVER - REVErse Regesta]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
85.905,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
6.013,34 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Scientific preparation/IT
|
||||
49 Activity short name
|
||||
7.2.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Consiglio Nazionale delle
|
||||
OU short name 1 Participant
|
||||
Ricerche
|
||||
|
||||
|
||||
|
||||
|
||||
301 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [7 - REVER - REVErse Regesta]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
52 Activity description
|
||||
This activity encompasses all the tasks related to IT requirements and expertise necessary for the WP. It also provides guidelines for pre-
|
||||
processing material to by analysed through REVER, based on the output of activity 7.1 These guidelines, although developed from a
|
||||
specific case, are designed to be applicable to other corpora as well: they are therefore not corpus-specific, but rather software-specific.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
82.500,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
66.222,09 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
17.883,04 €
|
||||
|
||||
Cost description: Costs of PhD scholarships not included in item (a); Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
106.750,00 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Scientific preparation/Corpus building
|
||||
49 Activity short name
|
||||
7.2.2
|
||||
50 Activity Start month and duration
|
||||
|
||||
|
||||
|
||||
302 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [7 - REVER - REVErse Regesta]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity carries out the collection of the Regesta Pontificum Romanorum and the full-text documents they refer to. To perform this
|
||||
activity it is necessary to secure access to institutions responsible for the preservation and the edition of data and sources (such as
|
||||
Vandenhoeck & Ruprecht, MGH, Ecole Française de Rome, Archivio Apostolico Vaticano).
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
161.250,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
12.463,64 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
61.801,98 €
|
||||
|
||||
|
||||
|
||||
|
||||
303 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [7 - REVER - REVErse Regesta]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Scientific preparation/Corpus pre-processing
|
||||
49 Activity short name
|
||||
7.2.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 6 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity carries out the corpus preparation and pre-processing for digital analysis of the Regesta Pontificum Romanorum and the full-
|
||||
text documents they refer to. It applies the guidelines for pre-processing as defined in A7.1 and A7.2.1 to the corpus prepared in
|
||||
A7.2.2.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
71.250,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
|
||||
|
||||
|
||||
304 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [7 - REVER - REVErse Regesta]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.5 e. Indirect costs
|
||||
8.137,50 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs not included in item (a); Consumables,
|
||||
participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
|
||||
|
|
@ -0,0 +1,407 @@
|
|||
|
||||
49 Activity short name
|
||||
8.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity is dedicated to the preliminary scientific and technical work for the development of uBIQUity. The first stage has the aim of
|
||||
gaining an empathic understanding of the WP research topic by using the Design Thinking process. This involves consulting researchers
|
||||
and experts internal and/or external to ITSERR to find out more about the process of connecting Biblical and Qu’ranic texts with their
|
||||
commentaries, through engaging with researchers to understand their needs, experiences and motivations so as to gain a deeper personal
|
||||
understanding of the research issues involved. This activity carries out three main tasks:
|
||||
1)The relevant texts (published and/or unpublished) are identified.
|
||||
2)Technical requirements and scientific needs are discussed with digital humanists and informatic engineers, and merged with user needs
|
||||
coming from domain-specific experts and users. As a result, technical, scientific and user-related requirements are prepared, and the most
|
||||
adequate software tools for implementing uBIQUity are identified, such as algorithms for citation recognition and algorithms for finding
|
||||
allusions, e.g. those developed to detect plagiarism in modern scientific literature (e.g., iThenticate) .
|
||||
3)General principles for corpus preparation and pre-processing are laid out.
|
||||
|
||||
|
||||
|
||||
327 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [8 - uBIQUity]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
3)General principles for corpus preparation and pre-processing are laid out.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
142.830,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
9.998,10 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Scientific Preparation
|
||||
49 Activity short name
|
||||
8.2.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
|
||||
|
||||
|
||||
328 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [8 - uBIQUity]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Consiglio Nazionale delle
|
||||
OU short name 1 Participant
|
||||
Ricerche
|
||||
|
||||
52 Activity description
|
||||
This activity encompasses all the tasks related to IT expertise necessary for the WP. It also provides IT supervision and coordination for
|
||||
the other WP activities. In particular, for WP 8 it prepares guidelines for corpus pre-processing, based on the output of activity A8.1.
|
||||
These guidelines, although developed from a specific case, are designed in order to be applicable to other corpora as well: they are therefore
|
||||
not corpus-specific, but rather software-specific.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
82.500,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
66.222,07 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
17.883,04 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
106.750,00 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
|
||||
|
||||
|
||||
329 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [8 - uBIQUity]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
48 Activity title
|
||||
Development
|
||||
49 Activity short name
|
||||
8.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli studi di
|
||||
OU short name 3 Participant
|
||||
Modena e Reggio Emilia
|
||||
|
||||
52 Activity description
|
||||
This activity has the goal of finalising all the work validated by the analysis and prototyping phase and by the scientific preparation
|
||||
phase, through the following tasks:
|
||||
1)Architecture/Design: this activity has the goal of bringing different perspectives together in one team to improve problem solving and
|
||||
lead to smarter, more sustainable decision making and re-usable/cost-effective architectural/design components. As such, this is a cross-
|
||||
functional activity, that links together this and other WPs and the RESILIENCE technical team, in order to optimise the use of time,
|
||||
money, and effort to improve researchers’ satisfaction while helping to meet RESILIENCE RI goals. In particular, the
|
||||
Architecture/Design task ensures that:
|
||||
a)A RESILIENCE architecture and design common components repository is maintained
|
||||
b)A performant, secure, robust and stable architecture and design for the ITSERR software requirements is created.
|
||||
c)Respect of the architectural and design recommendations is guaranteed
|
||||
2)It optimises an algorithm for citation recognition within the case-study corpora, and upgrades it with citation network analysis
|
||||
capabilities: to this end software tools for visualising and analysing citation networks of scientific publications (e.g., CitNetExplorer) are
|
||||
integrated in the uBIQUity-specific citation recognition algorithm
|
||||
3)It optimises an algorithm for producing a list of possible allusions within the case-study corpora, with a selectable degree of similarity.
|
||||
To this purpose, it experiments already existing algorithms as identified in A8.1 and validated in A8.2
|
||||
4)It prepares the platform and user interface for deployment on a shared platform that hosts the Bible-dedicated and the Qur’an-dedicated
|
||||
databases
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
416.900,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
|
||||
|
||||
|
||||
330 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [8 - uBIQUity]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
29.183,00 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Test
|
||||
49 Activity short name
|
||||
8.4
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 6 Activity Duration 37
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity makes use of best of breed tools and techniques to rigorously test uBIQUity. Although this may look as an almost final
|
||||
stage, we should not forget that it is an iterative process. The results thus generated during the testing phase are often used to nurture
|
||||
researchers thinking to refine/broaden problems, complete their problem understanding, improve the conditions of use, etc. Additionally,
|
||||
the test is run with the aid of domain-specific scholars, that provide high-profile feedback on the functionalities of uBIQUity for research
|
||||
on religious texts. Even during this stage, therefore, updates are made in order to rule out problems and derive an as deep as possible,
|
||||
clear understanding of the ITSERR services/products offered to the researchers.
|
||||
More specifically this activity covers the following tasks:
|
||||
1)It sets up the uBIQUity prototype, as developed and prepared in A8.3, in order to make it available for testing.
|
||||
|
||||
|
||||
331 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [8 - uBIQUity]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
1)It sets up the uBIQUity prototype, as developed and prepared in A8.3, in order to make it available for testing.
|
||||
2)It tests the prototype with IT personnel and with the scientific community, collecting feedback necessary for improving the prototype, for
|
||||
ameliorating the documentation, and for producing training material
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
123.165,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
8.621,55 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Operations
|
||||
49 Activity short name
|
||||
8.5
|
||||
50 Activity Start month and duration
|
||||
|
||||
|
||||
|
||||
|
||||
332 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [8 - uBIQUity]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli studi di
|
||||
OU short name 3 Participant
|
||||
Modena e Reggio Emilia
|
||||
|
||||
52 Activity description
|
||||
The operation activity ensures that the software produced in the WP is put in production, and prepares it for integration in the
|
||||
RESILIENCE infrastructure. It also sets up uBIQUity and its related material for Continuous Delivery, ensuring that the code, the
|
||||
uBIQUity platform and its attached material are always in a release-ready state. The ultimate culmination of this process is the
|
||||
Continuous Deployment.
|
||||
In particular, the operation activity carries out the following tasks:
|
||||
1)It provides that technical documents and whitepapers are produced and published for uBIQUity.
|
||||
2)It provides that uBIQUity goes into production as a RESILIENCE-RI.EU hosted services and that the uBIQUity-powered
|
||||
platform for Bible and Qur’anic texts and commentaries is published as an online and browsable tool.
|
||||
3)It provides that uBIQUity’s source code and binaries are packaged as Open Source software for publication to RESILIENCE
|
||||
software marketplace.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
91.725,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
6.420,75 €
|
||||
|
||||
|
||||
|
||||
|
||||
333 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [8 - uBIQUity]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Scientific Preparation/Bible and Qu’ran
|
||||
49 Activity short name
|
||||
8.2.2
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity encompasses all the tasks related to domain-specific requirements and expertise necessary for the WP. In particular, it
|
||||
validates the status and adequacy of the texts identified in A8.1 and it applies corpus pre-processing guidelines to the use-case corpora,
|
||||
composed of Bible and Qu’ranic texts and their commentaries, thus preparing the texts for software analysis.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
242.500,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
|
||||
|
||||
|
||||
334 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [8 - uBIQUity]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
16.275,00 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs not included in item (a); Consumables,
|
||||
participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Scientific Preparation/Architectural localisation
|
||||
49 Activity short name
|
||||
8.2.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 9 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
This activity encompasses all the tasks related to identifying spaces and places in Bible and Qu’ranic texts and commentaries, and to
|
||||
linking them to existing (or once-existing) spaces and places.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
106.250,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
|
||||
|
||||
|
||||
335 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [8 - uBIQUity]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
12.463,64 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
61.801,94 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
|
||||
|
|
@ -0,0 +1,282 @@
|
|||
|
||||
49 Activity short name
|
||||
9.2
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 10 Participant
|
||||
Torino
|
||||
|
||||
52 Activity description
|
||||
This activity performs and covers the following tasks:
|
||||
1)acquisition of source material and domain-specific curation;
|
||||
2)mapping of the history of conservation for artefacts of particular importance in terms of type, quality, technology and materials, and of
|
||||
preservation, collector and museum history (for ACIS);
|
||||
3)validation of requirements and supervision of the software developed in activity A9.3.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
232.500,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
277.970,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
|
||||
|
||||
|
||||
355 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [9 - TAURUS – Toolkit for Analysis and
|
||||
visUalisation for aRchaeology and religioUs Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
50.000,00 €
|
||||
|
||||
Cost description: Transnational access; FAIRification
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
42.969,15 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
53.375,00 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Analysis and Prototyping
|
||||
49 Activity short name
|
||||
9.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 10 Participant
|
||||
Torino
|
||||
|
||||
52 Activity description
|
||||
This activity is dedicated to the following tasks:
|
||||
●Recognition and experimenting of 3D acquisition and visualisation tools (for EnLil and ACIS).
|
||||
●Analysis of source archives (for tablets, archaeological site data, artefacts).
|
||||
●Layout of requirements for the software tools and for pre-processing of source archives (where needed).
|
||||
●Layout of requirements for the database where (meta)data extracted from sources is stored and made available to ACIS and then to
|
||||
|
||||
|
||||
|
||||
356 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [9 - TAURUS – Toolkit for Analysis and
|
||||
visUalisation for aRchaeology and religioUs Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
●Layout of requirements for the database where (meta)data extracted from sources is stored and made available to ACIS and then to
|
||||
EnLil.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
121.757,50 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
8.523,01 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Test
|
||||
49 Activity short name
|
||||
9.4
|
||||
50 Activity Start month and duration
|
||||
|
||||
|
||||
|
||||
|
||||
357 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [9 - TAURUS – Toolkit for Analysis and
|
||||
visUalisation for aRchaeology and religioUs Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
Activity Start month 6 Activity Duration 37
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 10 Participant
|
||||
Torino
|
||||
|
||||
52 Activity description
|
||||
This activity is responsible for testing the TAURUS toolkit in each of its elements. In particular it tests:
|
||||
1)the 3D acquisition system developed in A9.3.
|
||||
2)The automatic metadatation prototype developed in A9.3
|
||||
3)The optimised visualisation prototypes for EnLil, ACIS
|
||||
Testing is run using a sample of domain-specific scholars and IT personnel; feedback is collected and elaborated for improvement of the
|
||||
prototypes and for production of documentation and training materials.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
66.742,50 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
4.671,98 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
|
||||
|
||||
|
||||
358 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [9 - TAURUS – Toolkit for Analysis and
|
||||
visUalisation for aRchaeology and religioUs Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Development
|
||||
49 Activity short name
|
||||
9.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 10 Participant
|
||||
Torino
|
||||
|
||||
52 Activity description
|
||||
This activity carries out the development of software specified in A9.1, in particular, it aims to produce:
|
||||
1)Optimised 3D acquisition software (to be shared in principle by EnLil, ACIS).
|
||||
2)A prototype for automatic metadation of acquired material (tablets, artefacts).
|
||||
3)A repository for acquired (meta)data, as required by A9.1
|
||||
4)An enhancement and optimisation of 3D visualisation software for each of the prototypes (EnLil, ACIS).
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
224.302,50 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
|
||||
|
||||
359 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [9 - TAURUS – Toolkit for Analysis and
|
||||
visUalisation for aRchaeology and religioUs Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
15.701,18 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Operation
|
||||
49 Activity short name
|
||||
9.5
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 10 Participant
|
||||
Torino
|
||||
|
||||
52 Activity description
|
||||
The operation activity ensures that the TAURUS toolkit becomes operational and that it is properly run and released. In particular:
|
||||
1)It puts in production EnLil and ACIS
|
||||
2)It runs on specific use-cases
|
||||
3)It publishes the resulting databases on RESILIENCE;
|
||||
4)It prepares EnLil and ACIS source code and binaries are packaged as Open Source software for publication to RESILIENCE
|
||||
software marketplace.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
|
||||
|
||||
|
||||
360 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [9 - TAURUS – Toolkit for Analysis and
|
||||
visUalisation for aRchaeology and religioUs Studies]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
44.227,50 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
3.095,93 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
|
||||
|
|
@ -0,0 +1,287 @@
|
|||
|
||||
49 Activity short name
|
||||
10.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università di Napoli
|
||||
OU short name 4 Participant
|
||||
L’Orientale
|
||||
|
||||
52 Activity description
|
||||
|
||||
|
||||
|
||||
380 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [10 - ReTINA: Religious Texts In the Nile vAlley
|
||||
and Beyond]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
This activity carries out the task of selecting and analysing digital or paper archives containing religious texts coming from different times
|
||||
and geographical regions and written in Egyptian, Coptic, Meroitic, Old Nubian, Greek, Latin, different variants of South Arabian,
|
||||
Ge‘ez, on different writing supports.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
210.000,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
14.700,00 €
|
||||
|
||||
Cost description: -
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Operation
|
||||
49 Activity short name
|
||||
10.5
|
||||
50 Activity Start month and duration
|
||||
|
||||
|
||||
|
||||
|
||||
381 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [10 - ReTINA: Religious Texts In the Nile vAlley
|
||||
and Beyond]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università di Napoli
|
||||
OU short name 4 Participant
|
||||
L’Orientale
|
||||
|
||||
52 Activity description
|
||||
This activity implements the data model and the prototype developed in A10.3, ensuring that they are prepared for release in the
|
||||
RESILIENCE infrastructure and that they are optimised for the RESILIENCE ecosystem from a technical and scientific point of
|
||||
view.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
135.000,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
9.450,00 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
|
||||
|
||||
382 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [10 - ReTINA: Religious Texts In the Nile vAlley
|
||||
and Beyond]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Scientific preparation
|
||||
49 Activity short name
|
||||
10.2
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università di Napoli
|
||||
OU short name 4 Participant
|
||||
L’Orientale
|
||||
|
||||
52 Activity description
|
||||
Firstly, this activity has the goal of cataloguing the datasets and description of the original contexts of relevance (geo-referenced) and
|
||||
position of the documents within them, cataloguing the support materials with the adoption of an archaeometric approach. Secondly, it
|
||||
collects transliterations and translations of the selected texts, analysing their linguistic peculiarity, their formal aspects, and highlighting
|
||||
common traits and topics in the documents coming from different periods and cultures.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
232.500,00 €
|
||||
|
||||
Cost description: Temporary research personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
50.000,00 €
|
||||
|
||||
Cost description: Transnational Access activities and management. FAIRification of data
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
|
||||
|
||||
383 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [10 - ReTINA: Religious Texts In the Nile vAlley
|
||||
and Beyond]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
27.247,50 €
|
||||
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships not included in item (a);
|
||||
Consumables, participation to events, dissemination, travels
|
||||
54.6 f. Training activities
|
||||
106.750,00 €
|
||||
|
||||
Cost description: PhD scholarships
|
||||
48 Activity title
|
||||
Development
|
||||
49 Activity short name
|
||||
10.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università di Napoli
|
||||
OU short name 4 Participant
|
||||
L’Orientale
|
||||
|
||||
52 Activity description
|
||||
This activity develops guidelines for corpus digitisation, optimising existing data models to account for the complexity of the case study.
|
||||
The activity also has the task of developing the following steps of the digitisation process, including 3D data-acquisition, identification of
|
||||
standards, metadata, taxonomies, thesauri, ontologies, etc.
|
||||
Finally, it develops a software prototype for annotation of the texts and visualisation of the annotated texts and relative information.
|
||||
|
||||
ITSERR software development activity is based upon DevSecOps (See Annex 1 - Figure 1.12) to:
|
||||
●allow the deployment of code faster and in an automated way;
|
||||
●increase speed to delivery of applications and services;
|
||||
●ensure alignment of development and IT operations (WP2) (in the same way that agile aligns development and researchers);
|
||||
●and integrate security in the design process.
|
||||
Agile DevSecOps is compatible with Continuous Integration / Continuous Deployment (CI/CD) principles, ensuring that the software
|
||||
can be reliably released any time. The goal is that all software components are merged into the main branch as often as possible, passing
|
||||
automated tests before each commit. CI/CD does not replace User Acceptance Testing, but quickly provides incremental releases, using
|
||||
|
||||
|
||||
|
||||
384 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [10 - ReTINA: Religious Texts In the Nile vAlley
|
||||
and Beyond]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
automated tests before each commit. CI/CD does not replace User Acceptance Testing, but quickly provides incremental releases, using
|
||||
as much automation as possible.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
380.000,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
26.600,00 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Test
|
||||
49 Activity short name
|
||||
10.4
|
||||
50 Activity Start month and duration
|
||||
|
||||
|
||||
|
||||
|
||||
385 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [10 - ReTINA: Religious Texts In the Nile vAlley
|
||||
and Beyond]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
Activity Start month 6 Activity Duration 37
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università di Napoli
|
||||
OU short name 4 Participant
|
||||
L’Orientale
|
||||
|
||||
52 Activity description
|
||||
This activity is tasked with testing both the data model and the software prototype developed in A10.3. Testing is run using a sample of
|
||||
domain-specific scholars and IT personnel, based on the corpus collected through activities A10.1 and A10.2; feedback is collected and
|
||||
elaborated for improvement of the tools and for production of documentation and training materials.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
150.000,00 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
10.500,00 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
|
||||
|
||||
386 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [10 - ReTINA: Religious Texts In the Nile vAlley
|
||||
and Beyond]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Cost description: -
|
||||
|
||||
|
|
@ -0,0 +1,221 @@
|
|||
|
||||
49 Activity short name
|
||||
11.4
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 5 Activity Duration 38
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
The final objective of this activity is to make sure that, as for all ITSERR WPs, feedback is collected on the tasks performed, discussed
|
||||
among the appropriate stakeholders to nurture our Continuous Improvement Process. To do so, the TNA team will:
|
||||
●Ensure that all users fill in the evaluation questionnaire to monitor the quality of the TNA services and request the users to publish
|
||||
their results (ie. via RESILIENCE publication services)
|
||||
●Analyse periodically the feedback within the TNA Management Team and reports the suggested improvement, with costs, duration and
|
||||
resources needed, in the bi-monthly Services Report to the Steering Committee meeting. The SCM will decide what suggestions to
|
||||
implement
|
||||
●Communication the with RESILIENCE TNA Team
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
34.559,19 €
|
||||
|
||||
Cost description: Fixed-term personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
|
||||
|
||||
|
||||
402 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [11 - Trans-National Access]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
2.419,14 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
TNA Services Brainstorming
|
||||
49 Activity short name
|
||||
11.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 1
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
A contact is made with the RESILIENCE team managing the TNA to get the latest version of their TNA Management Plan.
|
||||
The ITSERR team performs an analysis of their RESILIENCE TNA Management Plan.
|
||||
Two co-creation collaborative workshops are organised with all the WP Leaders and the key researchers participating in the Work
|
||||
Packages activities to decide the best way to organise the TNA activities within Italy.
|
||||
After these two workshops, the team publishes a ITSERR version of the TNA Management Plan and any improvement proposals to
|
||||
the mother project are synchronised with the RESILIENCE TNA team.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
15.759,86 €
|
||||
|
||||
|
||||
|
||||
|
||||
403 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [11 - Trans-National Access]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Cost description: Fixed-term personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
403,19 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Planning of TNA activities
|
||||
49 Activity short name
|
||||
11.2
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 3 Activity Duration 1
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
|
||||
|
||||
|
||||
404 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [11 - Trans-National Access]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
A catalogue of all digital and physical resources that can be proposed through the call for proposals is inventoried.
|
||||
Two co-creation collaborative workshops are organised with all the WP Leaders and the key researchers participating in the Work
|
||||
Packages activities to:
|
||||
●Establish the TNA resources selection criteria
|
||||
●Select the best digital and physical resources to be proposed for access in the future TNA calls for proposals.
|
||||
After these two workshops, the team publishes the resources within the TNA Management Plan and communicates these to the
|
||||
RESILIENCE project.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
16.971,84 €
|
||||
|
||||
Cost description: Fixed-term personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
488,03 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
48 Activity title
|
||||
Execution of TNA activities
|
||||
49 Activity short name
|
||||
11.3
|
||||
|
||||
|
||||
|
||||
405 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [11 - Trans-National Access]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 4 Activity Duration 39
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
The execution of the TNA services will be performed as such:
|
||||
1.Based on the pre-established planning, publication of dedicated calls for submission of research which detail the expertise and services
|
||||
provided by ITSERR TNA, listing requirements and conditions for access.
|
||||
2.A Peer Review Committee provides a selection and ranking of the submitted projects, on the basis of rigorous criteria and giving priority
|
||||
to specific kinds of proposals such as those engaged with gender issues, those led by young scholars or those proposed by users who belong to
|
||||
countries with no similar RI in this domain.
|
||||
3.The consortium grants to users the funds for travel and subsistence for the whole duration of their project.
|
||||
4.The users of transnational access organise their stay in the ITSERR partners facilities, with the constant tutorial of experts which
|
||||
grant a specific training on the study and use of the documents preserved in their collections or archives and offer their experience to discuss
|
||||
the setting, implementation and evaluation of the research activities.
|
||||
All these activities are coordinated, published and administered by a dedicated TNA Administrative Team.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
56.798,20 €
|
||||
|
||||
Cost description: Fixed-term personnel
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
470.568,96 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
54.5 e. Indirect costs
|
||||
38.315,70 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: -
|
||||
|
||||
|
||||
|
|
@ -0,0 +1,186 @@
|
|||
|
||||
49 Activity short name
|
||||
12.1
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 6
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
|
||||
|
||||
|
||||
178 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [12 - Data Management Services]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
The Data Management Plan (DMP) is intended to be a living document in which information can be made available on a finer level of
|
||||
granularity through updates as the implementation of the project progresses and when significant changes occur.
|
||||
Additionally, no single strategy can cover the integration and interoperation of the diverse datasets to be included in ITSERR: for these
|
||||
reasons, the Data Management Plan is accurately designed to ensure that data that enters the ecosystem is FAIR (findable, interoperable,
|
||||
accessible and reusable).
|
||||
The following activities will be performed:
|
||||
●Analysis of RESILIENCE Data Management Plan
|
||||
●Collecting data services requirements on data produced and collected by the ITA WPs
|
||||
●Virtual information sessions on proper data handling with RESILIENCE Team, incl. GDPR, Open Science, FAIR principles
|
||||
●Eventual updates to RESILIENCE Data management plan
|
||||
●Presentation of RESILIENCE DMP and Q&A to all WP leaders (incl. FAIR, Open Science principles, tools, etc.)
|
||||
●Reviews and revision of RESILIENCE DMP proposed to RESILIENCE Team
|
||||
●Data Management Services (DMS)
|
||||
●Data Services Brainstorming
|
||||
●Preparation Workshops
|
||||
●ITSERR Data Management Services Analysis
|
||||
●Set-up of the ITSERR data handling and organisation
|
||||
●Set-up long term archiving and publication of core Resilience data according to Open Science and FAIR principles for ITSERR.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
54.482,40 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.5 e. Indirect costs
|
||||
|
||||
|
||||
|
||||
179 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [12 - Data Management Services]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
3.813,77 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
48 Activity title
|
||||
Reference Data Services
|
||||
49 Activity short name
|
||||
12.2
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
ITSERR has the objective to re-use and set-up a Reference Data Model by developing a baseline operational data model and maintain
|
||||
it as a long term Reference Data Model for data managed on the RESILIENCE ecosystem.
|
||||
Our Reference Data Model is build as such:
|
||||
●Collecting (Meta)Data requirements from all stakeholders
|
||||
●Building out the infrastructure to support a reference data model
|
||||
●Creation of a process for updating the model (including data governance approval)
|
||||
●Use the model content to organise and structure data hosted on RESILIENCE
|
||||
●Keep refining the model while supporting new projects on the platform.
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
106.646,40 €
|
||||
|
||||
|
||||
|
||||
|
||||
180 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [12 - Data Management Services]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.5 e. Indirect costs
|
||||
7.465,25 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
48 Activity title
|
||||
Data Services Execution
|
||||
49 Activity short name
|
||||
12.3
|
||||
50 Activity Start month and duration
|
||||
|
||||
Activity Start month 2 Activity Duration 41
|
||||
|
||||
51 OU in charge of the Activity
|
||||
|
||||
Università degli Studi di
|
||||
OU short name 5 Participant
|
||||
Palermo
|
||||
|
||||
52 Activity description
|
||||
The Data Services Execution is the implementation of a series of artefacts(software, guidelines, training, etc) helping each work package
|
||||
to implement adequately their Data Management LifeCycle (DMLC). This activity will perform the following tasks:
|
||||
●Selection and prioritisation of services to be implemented for ITSERR: based on the WP data management requirements, we’ll identify
|
||||
a set of tools to be created and/or set-up to implement the DMLC
|
||||
●Architecture and design of the software components implementing the data management services to be hosted within RESILIENCE
|
||||
●Development and testing of the services
|
||||
|
||||
|
||||
181 /453
|
||||
d) PROJECT WORK BREAKDOWN STRUCTURE - [12 - Data Management Services]
|
||||
(The information provided in this section will be evaluated with reference to criteria C1-C5)
|
||||
|
||||
●Development and testing of the services
|
||||
●Operation: the Data Centre Services team ensures that all artefacts produced, transformed and managed by the tools are available
|
||||
24/7, that the back-up of data is performed and that the project capacity is sufficiently sized (ie: memory, space, processing).
|
||||
●Documentation writing for RESILIENCE: this documentation becomes part of the RESILIENCE knowledge management
|
||||
repository
|
||||
54 Activity budget
|
||||
54.1 a. Cost of fixed term personnel specifically hired for the project
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.2 b. Scientific instrumentation and technological equipment, software licenses and patent
|
||||
151.068,60 €
|
||||
|
||||
Cost description: Licences, hardware, cloud storage, services
|
||||
54.3 c. Open Access, Transnational Access, FAIR principle implementation
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.4 d. Civil infrastructures and related systems
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
54.5 e. Indirect costs
|
||||
10.574,80 €
|
||||
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
54.6 f. Training activities
|
||||
0,00 €
|
||||
|
||||
Cost description: 0
|
||||
|
||||
|
||||
File diff suppressed because it is too large
Load Diff
File diff suppressed because it is too large
Load Diff
File diff suppressed because it is too large
Load Diff
File diff suppressed because it is too large
Load Diff
File diff suppressed because it is too large
Load Diff
|
|
@ -0,0 +1,761 @@
|
|||
32.2 For each Work Package (Specific Objective), as per the following table
|
||||
COSTS (€)
|
||||
WORK PACKAGE [3 - T-ReS - Toolkit for Religious Studies]
|
||||
|
||||
Costs included in the request for funding
|
||||
|
||||
To be located within the To be located outside the Total requested grant
|
||||
eight southern Regions eight southern Regions
|
||||
|
||||
a. Fixed term
|
||||
personnel 465.000,00 296.387,44 761.387,44
|
||||
specifically hired for
|
||||
the project
|
||||
|
||||
b. Scientific
|
||||
instrumentation and
|
||||
technological 1.820.013,00 169.602,09 1.989.615,09
|
||||
equipment, software
|
||||
licenses and patent
|
||||
|
||||
c. Open Access, Trans
|
||||
National Access, 0,00 0,00 0,00
|
||||
FAI principal
|
||||
implementation
|
||||
|
||||
d. Civil infrastructures 0,00 0,00 0,00
|
||||
and related systems
|
||||
|
||||
e. Indirect costs,
|
||||
including running 177.255,46 40.091,77 217.347,23
|
||||
costs
|
||||
|
||||
f. Training activities 247.207,91 106.750,00 353.957,91
|
||||
|
||||
Total 2.709.476,37 612.831,30 3.322.307,67
|
||||
|
||||
|
||||
|
||||
|
||||
63 / 453
|
||||
WP budget description
|
||||
|
||||
Cost of fixed term personnel specifically hired for the project
|
||||
Cost description: Temporary research personnel
|
||||
|
||||
Scientific instrumentation and technological equipment, software licenses and patent
|
||||
Cost description: Software analysis, development, test and operations; licenses; hardware; cloud storage and
|
||||
services
|
||||
|
||||
Open Access, Transnational Access, FAIR principle implementation
|
||||
Cost description: Nessuno
|
||||
|
||||
Civil infrastructures and related systems
|
||||
Cost description: Nessuno
|
||||
|
||||
Indirect costs
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships
|
||||
not included in item (a); Consumables, participation to events, dissemination, travels
|
||||
|
||||
Training activities
|
||||
Cost description: PhD scholarships
|
||||
|
||||
|
||||
|
||||
|
||||
64 / 453
|
||||
32.2 For each Work Package (Specific Objective), as per the following table
|
||||
COSTS (€)
|
||||
WORK PACKAGE [2 - Data Centre Services]
|
||||
|
||||
Costs included in the request for funding
|
||||
|
||||
To be located within the To be located outside the Total requested grant
|
||||
eight southern Regions eight southern Regions
|
||||
|
||||
a. Fixed term
|
||||
personnel 0,00 0,00 0,00
|
||||
specifically hired for
|
||||
the project
|
||||
|
||||
b. Scientific
|
||||
instrumentation and
|
||||
technological 1.680.444,40 0,00 1.680.444,40
|
||||
equipment, software
|
||||
licenses and patent
|
||||
|
||||
c. Open Access, Trans
|
||||
National Access, 0,00 0,00 0,00
|
||||
FAI principal
|
||||
implementation
|
||||
|
||||
d. Civil infrastructures 0,00 0,00 0,00
|
||||
and related systems
|
||||
|
||||
e. Indirect costs,
|
||||
including running 117.631,11 0,00 117.631,11
|
||||
costs
|
||||
|
||||
f. Training activities 0,00 0,00 0,00
|
||||
|
||||
Total 1.798.075,51 0,00 1.798.075,51
|
||||
|
||||
|
||||
|
||||
|
||||
65 / 453
|
||||
WP budget description
|
||||
|
||||
Cost of fixed term personnel specifically hired for the project
|
||||
Cost description: Nessuno
|
||||
|
||||
Scientific instrumentation and technological equipment, software licenses and patent
|
||||
Cost description: Software analysis, development, test and operations; licenses; hardware; cloud storage and
|
||||
services
|
||||
|
||||
Open Access, Transnational Access, FAIR principle implementation
|
||||
Cost description: Nessuno
|
||||
|
||||
Civil infrastructures and related systems
|
||||
Cost description: Nessuno
|
||||
|
||||
Indirect costs
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
|
||||
Training activities
|
||||
Cost description: Nessuno
|
||||
|
||||
|
||||
|
||||
|
||||
66 / 453
|
||||
32.2 For each Work Package (Specific Objective), as per the following table
|
||||
COSTS (€)
|
||||
WORK PACKAGE [12 - Data Management Services]
|
||||
|
||||
Costs included in the request for funding
|
||||
|
||||
To be located within the To be located outside the Total requested grant
|
||||
eight southern Regions eight southern Regions
|
||||
|
||||
a. Fixed term
|
||||
personnel 0,00 0,00 0,00
|
||||
specifically hired for
|
||||
the project
|
||||
|
||||
b. Scientific
|
||||
instrumentation and
|
||||
technological 312.197,40 0,00 312.197,40
|
||||
equipment, software
|
||||
licenses and patent
|
||||
|
||||
c. Open Access, Trans
|
||||
National Access, 0,00 0,00 0,00
|
||||
FAI principal
|
||||
implementation
|
||||
|
||||
d. Civil infrastructures 0,00 0,00 0,00
|
||||
and related systems
|
||||
|
||||
e. Indirect costs,
|
||||
including running 21.853,82 0,00 21.853,82
|
||||
costs
|
||||
|
||||
f. Training activities 0,00 0,00 0,00
|
||||
|
||||
Total 334.051,22 0,00 334.051,22
|
||||
|
||||
|
||||
|
||||
|
||||
67 / 453
|
||||
WP budget description
|
||||
|
||||
Cost of fixed term personnel specifically hired for the project
|
||||
Cost description: Nessuno
|
||||
|
||||
Scientific instrumentation and technological equipment, software licenses and patent
|
||||
Cost description: Software analysis, test and operations; licenses; hardware; cloud storage and services
|
||||
|
||||
Open Access, Transnational Access, FAIR principle implementation
|
||||
Cost description: Nessuno
|
||||
|
||||
Civil infrastructures and related systems
|
||||
Cost description: Nessuno
|
||||
|
||||
Indirect costs
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
|
||||
Training activities
|
||||
Cost description: Nessuno
|
||||
|
||||
|
||||
|
||||
|
||||
68 / 453
|
||||
32.2 For each Work Package (Specific Objective), as per the following table
|
||||
COSTS (€)
|
||||
WORK PACKAGE [4 - DaMSym - Data Mining: the Nicene-Constantinopolitan Symbolum]
|
||||
|
||||
Costs included in the request for funding
|
||||
|
||||
To be located within the To be located outside the Total requested grant
|
||||
eight southern Regions eight southern Regions
|
||||
|
||||
a. Fixed term
|
||||
personnel 277.500,00 110.412,56 387.912,56
|
||||
specifically hired for
|
||||
the project
|
||||
|
||||
b. Scientific
|
||||
instrumentation and
|
||||
technological 984.250,04 142.197,09 1.126.447,13
|
||||
equipment, software
|
||||
licenses and patent
|
||||
|
||||
c. Open Access, Trans
|
||||
National Access, 0,00 0,00 0,00
|
||||
FAI principal
|
||||
implementation
|
||||
|
||||
d. Civil infrastructures 0,00 0,00 0,00
|
||||
and related systems
|
||||
|
||||
e. Indirect costs,
|
||||
including running 102.477,04 33.524,38 136.001,42
|
||||
costs
|
||||
|
||||
f. Training activities 247.207,91 226.310,00 473.517,91
|
||||
|
||||
Total 1.611.434,99 512.444,03 2.123.879,02
|
||||
|
||||
|
||||
|
||||
|
||||
69 / 453
|
||||
WP budget description
|
||||
|
||||
Cost of fixed term personnel specifically hired for the project
|
||||
Cost description: Temporary research personnel
|
||||
|
||||
Scientific instrumentation and technological equipment, software licenses and patent
|
||||
Cost description: Software analysis, development, test and operations; licenses; hardware; cloud storage and
|
||||
services
|
||||
|
||||
Open Access, Transnational Access, FAIR principle implementation
|
||||
Cost description: Nessuno
|
||||
|
||||
Civil infrastructures and related systems
|
||||
Cost description: Nessuno
|
||||
|
||||
Indirect costs
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships
|
||||
not included in item (a); Consumables, participation to events, dissemination, travels
|
||||
|
||||
Training activities
|
||||
Cost description: PhD scholarships
|
||||
|
||||
|
||||
|
||||
|
||||
70 / 453
|
||||
32.2 For each Work Package (Specific Objective), as per the following table
|
||||
COSTS (€)
|
||||
WORK PACKAGE [5 - Digital Maktaba]
|
||||
|
||||
Costs included in the request for funding
|
||||
|
||||
To be located within the To be located outside the Total requested grant
|
||||
eight southern Regions eight southern Regions
|
||||
|
||||
a. Fixed term
|
||||
personnel 151.250,00 203.400,00 354.650,00
|
||||
specifically hired for
|
||||
the project
|
||||
|
||||
b. Scientific
|
||||
instrumentation and
|
||||
technological 367.425,00 1.214.824,84 1.582.249,84
|
||||
equipment, software
|
||||
licenses and patent
|
||||
|
||||
c. Open Access, Trans
|
||||
National Access, 0,00 0,00 0,00
|
||||
FAI principal
|
||||
implementation
|
||||
|
||||
d. Civil infrastructures 0,00 0,00 0,00
|
||||
and related systems
|
||||
|
||||
e. Indirect costs,
|
||||
including running 42.509,52 119.302,04 161.811,56
|
||||
costs
|
||||
|
||||
f. Training activities 123.603,96 286.090,00 409.693,96
|
||||
|
||||
Total 684.788,48 1.823.616,88 2.508.405,36
|
||||
|
||||
|
||||
|
||||
|
||||
71 / 453
|
||||
WP budget description
|
||||
|
||||
Cost of fixed term personnel specifically hired for the project
|
||||
Cost description: Temporary research personnel
|
||||
|
||||
Scientific instrumentation and technological equipment, software licenses and patent
|
||||
Cost description: Software analysis, development, test and operations; licenses; hardware; cloud storage and
|
||||
services
|
||||
|
||||
Open Access, Transnational Access, FAIR principle implementation
|
||||
Cost description: Nessuno
|
||||
|
||||
Civil infrastructures and related systems
|
||||
Cost description: Nessuno
|
||||
|
||||
Indirect costs
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships
|
||||
not included in item (a); Consumables, participation to events, dissemination, travels
|
||||
|
||||
Training activities
|
||||
Cost description: PhD scholarships
|
||||
|
||||
|
||||
|
||||
|
||||
72 / 453
|
||||
32.2 For each Work Package (Specific Objective), as per the following table
|
||||
COSTS (€)
|
||||
WORK PACKAGE [6 - YASMINE - Yet Another visual-Semantic Metascraper for Intelligent kNowledge
|
||||
Extraction]
|
||||
|
||||
Costs included in the request for funding
|
||||
|
||||
To be located within the To be located outside the Total requested grant
|
||||
eight southern Regions eight southern Regions
|
||||
|
||||
a. Fixed term
|
||||
personnel 152.500,00 324.300,00 476.800,00
|
||||
specifically hired for
|
||||
the project
|
||||
|
||||
b. Scientific
|
||||
instrumentation and
|
||||
technological 643.735,50 357.644,84 1.001.380,34
|
||||
equipment, software
|
||||
licenses and patent
|
||||
|
||||
c. Open Access, Trans
|
||||
National Access, 0,00 0,00 0,00
|
||||
FAI principal
|
||||
implementation
|
||||
|
||||
d. Civil infrastructures 0,00 0,00 0,00
|
||||
and related systems
|
||||
|
||||
e. Indirect costs,
|
||||
including running 65.662,62 88.685,44 154.348,06
|
||||
costs
|
||||
|
||||
f. Training activities 61.801,98 584.990,00 646.791,98
|
||||
|
||||
Total 923.700,10 1.355.620,28 2.279.320,38
|
||||
|
||||
|
||||
|
||||
|
||||
73 / 453
|
||||
WP budget description
|
||||
|
||||
Cost of fixed term personnel specifically hired for the project
|
||||
Cost description: Temporary research personnel
|
||||
|
||||
Scientific instrumentation and technological equipment, software licenses and patent
|
||||
Cost description: Software analysis, development, test and operations; licenses; hardware; cloud storage and
|
||||
services
|
||||
|
||||
Open Access, Transnational Access, FAIR principle implementation
|
||||
Cost description: Nessuno
|
||||
|
||||
Civil infrastructures and related systems
|
||||
Cost description: Nessuno
|
||||
|
||||
Indirect costs
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships
|
||||
not included in item (a); Consumables, participation to events, dissemination, travels
|
||||
|
||||
Training activities
|
||||
Cost description: PhD scholarships
|
||||
|
||||
|
||||
|
||||
|
||||
74 / 453
|
||||
32.2 For each Work Package (Specific Objective), as per the following table
|
||||
COSTS (€)
|
||||
WORK PACKAGE [7 - REVER - REVErse Regesta]
|
||||
|
||||
Costs included in the request for funding
|
||||
|
||||
To be located within the To be located outside the Total requested grant
|
||||
eight southern Regions eight southern Regions
|
||||
|
||||
a. Fixed term
|
||||
personnel 232.500,00 203.400,00 435.900,00
|
||||
specifically hired for
|
||||
the project
|
||||
|
||||
b. Scientific
|
||||
instrumentation and
|
||||
technological 183.712,50 653.784,59 837.497,09
|
||||
equipment, software
|
||||
licenses and patent
|
||||
|
||||
c. Open Access, Trans
|
||||
National Access, 0,00 0,00 0,00
|
||||
FAI principal
|
||||
implementation
|
||||
|
||||
d. Civil infrastructures 0,00 0,00 0,00
|
||||
and related systems
|
||||
|
||||
e. Indirect costs,
|
||||
including running 33.461,01 67.475,42 100.936,43
|
||||
costs
|
||||
|
||||
f. Training activities 61.801,98 106.750,00 168.551,98
|
||||
|
||||
Total 511.475,49 1.031.410,01 1.542.885,50
|
||||
|
||||
|
||||
|
||||
|
||||
75 / 453
|
||||
WP budget description
|
||||
|
||||
Cost of fixed term personnel specifically hired for the project
|
||||
Cost description: Temporary research personnel
|
||||
|
||||
Scientific instrumentation and technological equipment, software licenses and patent
|
||||
Cost description: Software analysis, development, test and operations; licenses; hardware; cloud storage and
|
||||
services
|
||||
|
||||
Open Access, Transnational Access, FAIR principle implementation
|
||||
Cost description: Nessuno
|
||||
|
||||
Civil infrastructures and related systems
|
||||
Cost description: Nessuno
|
||||
|
||||
Indirect costs
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships
|
||||
not included in item (a); Consumables, participation to events, dissemination, travels
|
||||
|
||||
Training activities
|
||||
Cost description: PhD scholarships
|
||||
|
||||
|
||||
|
||||
|
||||
76 / 453
|
||||
32.2 For each Work Package (Specific Objective), as per the following table
|
||||
COSTS (€)
|
||||
WORK PACKAGE [8 - uBIQUity]
|
||||
|
||||
Costs included in the request for funding
|
||||
|
||||
To be located within the To be located outside the Total requested grant
|
||||
eight southern Regions eight southern Regions
|
||||
|
||||
a. Fixed term
|
||||
personnel 348.750,00 82.500,00 431.250,00
|
||||
specifically hired for
|
||||
the project
|
||||
|
||||
b. Scientific
|
||||
instrumentation and
|
||||
technological 265.995,00 574.847,07 840.842,07
|
||||
equipment, software
|
||||
licenses and patent
|
||||
|
||||
c. Open Access, Trans
|
||||
National Access, 0,00 0,00 0,00
|
||||
FAI principal
|
||||
implementation
|
||||
|
||||
d. Civil infrastructures 0,00 0,00 0,00
|
||||
and related systems
|
||||
|
||||
e. Indirect costs,
|
||||
including running 47.358,29 53.486,79 100.845,08
|
||||
costs
|
||||
|
||||
f. Training activities 61.801,94 106.750,00 168.551,94
|
||||
|
||||
Total 723.905,23 817.583,86 1.541.489,09
|
||||
|
||||
|
||||
|
||||
|
||||
77 / 453
|
||||
WP budget description
|
||||
|
||||
Cost of fixed term personnel specifically hired for the project
|
||||
Cost description: Temporary research personnel
|
||||
|
||||
Scientific instrumentation and technological equipment, software licenses and patent
|
||||
Cost description: Software analysis, development, test and operations; licenses; hardware; cloud storage and
|
||||
services
|
||||
|
||||
Open Access, Transnational Access, FAIR principle implementation
|
||||
Cost description: Nessuno
|
||||
|
||||
Civil infrastructures and related systems
|
||||
Cost description: Nessuno
|
||||
|
||||
Indirect costs
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships
|
||||
not included in item (a); Consumables, participation to events, dissemination, travels
|
||||
|
||||
Training activities
|
||||
Cost description: PhD scholarships
|
||||
|
||||
|
||||
|
||||
|
||||
78 / 453
|
||||
32.2 For each Work Package (Specific Objective), as per the following table
|
||||
COSTS (€)
|
||||
WORK PACKAGE [9 - TAURUS – Toolkit for Analysis and visUalisation for aRchaeology and religioUs Studies]
|
||||
|
||||
Costs included in the request for funding
|
||||
|
||||
To be located within the To be located outside the Total requested grant
|
||||
eight southern Regions eight southern Regions
|
||||
|
||||
a. Fixed term
|
||||
personnel 0,00 232.500,00 232.500,00
|
||||
specifically hired for
|
||||
the project
|
||||
|
||||
b. Scientific
|
||||
instrumentation and
|
||||
technological 0,00 735.000,00 735.000,00
|
||||
equipment, software
|
||||
licenses and patent
|
||||
|
||||
c. Open Access, Trans
|
||||
National Access, 0,00 50.000,00 50.000,00
|
||||
FAI principal
|
||||
implementation
|
||||
|
||||
d. Civil infrastructures 0,00 0,00 0,00
|
||||
and related systems
|
||||
|
||||
e. Indirect costs,
|
||||
including running 0,00 74.961,25 74.961,25
|
||||
costs
|
||||
|
||||
f. Training activities 0,00 53.375,00 53.375,00
|
||||
|
||||
Total 0,00 1.145.836,25 1.145.836,25
|
||||
|
||||
|
||||
|
||||
|
||||
79 / 453
|
||||
WP budget description
|
||||
|
||||
Cost of fixed term personnel specifically hired for the project
|
||||
Cost description: Temporary research personnel
|
||||
|
||||
Scientific instrumentation and technological equipment, software licenses and patent
|
||||
Cost description: Software analysis, development, test and operations; licenses; hardware; cloud storage and
|
||||
services
|
||||
|
||||
Open Access, Transnational Access, FAIR principle implementation
|
||||
Cost description: Trans-National Access activities and management. FAIRification of data
|
||||
|
||||
Civil infrastructures and related systems
|
||||
Cost description: Nessuno
|
||||
|
||||
Indirect costs
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships
|
||||
not included in item (a); Consumables, participation to events, dissemination, travels
|
||||
|
||||
Training activities
|
||||
Cost description: PhD scholarships
|
||||
|
||||
|
||||
|
||||
|
||||
80 / 453
|
||||
32.2 For each Work Package (Specific Objective), as per the following table
|
||||
COSTS (€)
|
||||
WORK PACKAGE [10 - ReTINA: Religious Texts In the Nile vAlley and Beyond]
|
||||
|
||||
Costs included in the request for funding
|
||||
|
||||
To be located within the To be located outside the Total requested grant
|
||||
eight southern Regions eight southern Regions
|
||||
|
||||
a. Fixed term
|
||||
personnel 232.500,00 0,00 232.500,00
|
||||
specifically hired for
|
||||
the project
|
||||
|
||||
b. Scientific
|
||||
instrumentation and
|
||||
technological 875.000,00 0,00 875.000,00
|
||||
equipment, software
|
||||
licenses and patent
|
||||
|
||||
c. Open Access, Trans
|
||||
National Access, 50.000,00 0,00 50.000,00
|
||||
FAI principal
|
||||
implementation
|
||||
|
||||
d. Civil infrastructures 0,00 0,00 0,00
|
||||
and related systems
|
||||
|
||||
e. Indirect costs,
|
||||
including running 88.497,50 0,00 88.497,50
|
||||
costs
|
||||
|
||||
f. Training activities 106.750,00 0,00 106.750,00
|
||||
|
||||
Total 1.352.747,50 0,00 1.352.747,50
|
||||
|
||||
|
||||
|
||||
|
||||
81 / 453
|
||||
WP budget description
|
||||
|
||||
Cost of fixed term personnel specifically hired for the project
|
||||
Cost description: Temporary research personnel
|
||||
|
||||
Scientific instrumentation and technological equipment, software licenses and patent
|
||||
Cost description: Software analysis, development, test and operations; licenses; hardware; cloud storage and
|
||||
services
|
||||
|
||||
Open Access, Transnational Access, FAIR principle implementation
|
||||
Cost description: Trans-National Access activities and management. FAIRification of data
|
||||
|
||||
Civil infrastructures and related systems
|
||||
Cost description: Nessuno
|
||||
|
||||
Indirect costs
|
||||
Cost description: Costs covering public universities' temporary research personnel costs and PhD scholarships
|
||||
not included in item (a); Consumables, participation to events, dissemination, travels
|
||||
|
||||
Training activities
|
||||
Cost description: PhD scholarships
|
||||
|
||||
|
||||
|
||||
|
||||
82 / 453
|
||||
32.2 For each Work Package (Specific Objective), as per the following table
|
||||
COSTS (€)
|
||||
WORK PACKAGE [11 - Trans-National Access]
|
||||
|
||||
Costs included in the request for funding
|
||||
|
||||
To be located within the To be located outside the Total requested grant
|
||||
eight southern Regions eight southern Regions
|
||||
|
||||
a. Fixed term
|
||||
personnel 124.089,09 0,00 124.089,09
|
||||
specifically hired for
|
||||
the project
|
||||
|
||||
b. Scientific
|
||||
instrumentation and
|
||||
technological 470.568,96 0,00 470.568,96
|
||||
equipment, software
|
||||
licenses and patent
|
||||
|
||||
c. Open Access, Trans
|
||||
National Access, 0,00 0,00 0,00
|
||||
FAI principal
|
||||
implementation
|
||||
|
||||
d. Civil infrastructures 0,00 0,00 0,00
|
||||
and related systems
|
||||
|
||||
e. Indirect costs,
|
||||
including running 41.626,06 0,00 41.626,06
|
||||
costs
|
||||
|
||||
f. Training activities 0,00 0,00 0,00
|
||||
|
||||
Total 636.284,11 0,00 636.284,11
|
||||
|
||||
|
||||
|
||||
|
||||
83 / 453
|
||||
WP budget description
|
||||
|
||||
Cost of fixed term personnel specifically hired for the project
|
||||
Cost description: Fixed-term personnel
|
||||
|
||||
Scientific instrumentation and technological equipment, software licenses and patent
|
||||
Cost description: Technical equipment and software licences to allow Trans-National Access operations and
|
||||
research
|
||||
|
||||
Open Access, Transnational Access, FAIR principle implementation
|
||||
Cost description: Nessuno
|
||||
|
||||
Civil infrastructures and related systems
|
||||
Cost description: Nessuno
|
||||
|
||||
Indirect costs
|
||||
Cost description: Consumables, events, dissemination, communication, travels
|
||||
|
||||
Training activities
|
||||
Cost description: Nessuno
|
||||
|
||||
|
||||
|
||||
|
||||
84 / 453
|
||||
32.2 For each Work Package (Specific Objective), as per the following table
|
||||
COSTS (€)
|
||||
WORK PACKAGE [1 - Project and Impact Management]
|
||||
|
||||
Costs included in the request for funding
|
||||
|
||||
To be located within the To be located outside the Total requested grant
|
||||
eight southern Regions eight southern Regions
|
||||
|
||||
a. Fixed term
|
||||
personnel 495.535,91 493.875,00 989.410,91
|
||||
specifically hired for
|
||||
the project
|
||||
|
||||
b. Scientific
|
||||
instrumentation and
|
||||
technological 0,00 1.622.667,50 1.622.667,50
|
||||
equipment, software
|
||||
licenses and patent
|
||||
|
||||
c. Open Access, Trans
|
||||
National Access, 195.000,00 294.500,00 489.500,00
|
||||
FAI principal
|
||||
implementation
|
||||
|
||||
d. Civil infrastructures 200.000,00 0,00 200.000,00
|
||||
and related systems
|
||||
|
||||
e. Indirect costs,
|
||||
including running 62.337,51 172.272,97 234.610,48
|
||||
costs
|
||||
|
||||
f. Training activities 0,00 50.000,00 50.000,00
|
||||
|
||||
Total 952.873,42 2.633.315,47 3.586.188,89
|
||||
|
||||
|
||||
|
||||
|
|
@ -0,0 +1,44 @@
|
|||
|
||||
|
||||
32 Total budget for the proposal
|
||||
|
||||
32.1 Entire project costs
|
||||
COSTS (€)
|
||||
ENTIRE PROJECT
|
||||
|
||||
Costs included in the request for funding
|
||||
|
||||
To be located within the To be located outside the Total requested grant
|
||||
eight southern Regions eight southern Regions
|
||||
|
||||
a. Fixed term
|
||||
personnel 2.479.625,00 1.946.775,00 4.426.400,00
|
||||
specifically hired
|
||||
for the project
|
||||
|
||||
b. Scientific
|
||||
instrumentation
|
||||
and technological 7.603.341,80 5.470.568,02 13.073.909,82
|
||||
equipment,
|
||||
software licenses
|
||||
and patent
|
||||
|
||||
c. Open Access,
|
||||
Trans National
|
||||
Access, FAIR 245.000,00 344.500,00 589.500,00
|
||||
principle
|
||||
implementation
|
||||
|
||||
d. Civil infrastructures 200.000,00 0,00 200.000,00
|
||||
and related systems
|
||||
|
||||
e. Indirect costs,
|
||||
including running 800.669,94 649.800,06 1.450.470,00
|
||||
costs
|
||||
|
||||
f. Training activities 910.175,68 1.521.015,00 2.431.190,68
|
||||
|
||||
Total 12.238.812,42 9.932.658,08 22.171.470,50
|
||||
|
||||
|
||||
|
||||
Loading…
Reference in New Issue